Permit Number: TD-DEV-0224-00040
Parcel: 14122001E

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0224-00040
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2024 Commercial Plumbing APPROVED
02/28/2024 External Reviewers - Tucson Electric Power (TEP) APPROVED February 28, 2024 WO#T104887 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: New Industrial Building TD-DEV-0224-00040 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 2/13/2024. There are no existing facilities within the development and thus, at this time, there are no apparent conflicts. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Cruz Vega (520) 349-9850 cruzvega@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power
03/15/2024 NPPO APPROVED
03/15/2024 ROW Engineering Review APPROVED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
03/21/2024 CDRC Post Review Express PENDING ASSIGNMENT
03/15/2024 Site Engineering REQUIRES RESUBMIT TD-DEV-0224-00040
1. Provide a reference for each basin with their corresponding basin plan names: Basin 1 -> TE-BAS-0324-00030, Basin 2 -> TE-BAS-0324-00031.

Lianne Evans
lianne.evans@tucsonaz.gov
03/15/2024 Site Landscape REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-0224-00040
ADDRESS/PARCEL: 129-05-130R/8650 E OLD VAIL RD
ZONING: I-2

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

COMMENTS:
1. Ensure all Zoning and Engineering comments are addressed prior to the Landscape/NPPO comments.
2. Add the Development Package Case Number to all sheets.
3. Show all site visibility triangles on plan set sheets.
4. Identify curb inlets/splash pads to landscape areas on grading and water harvesting plans.
5. Show directional arrows on roof top for the Commercial Rainwater Harvesting plan.
If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
03/15/2024 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Wyatt Berger
Lead Planner

PROJECT: Old Vail Industrial
Development Package (1st Review)
TD-DEV-0224-00040

TRANSMITTAL DATE: March 15, 2024

DUE DATE: March 16, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is March 15, 2025.

1. COMMENT: 2-06.4.1 – Provide the registration number of the individual listed as the architect on the cover sheet.

2. COMMENT: 2-06.4.3 – Add the development package case number, TD-DEV-0224-00040, adjacent to the title block on all sheets.

3. COMMENT: 2-06.4.7.A.6 – Provide a general note stating that the project is designed to meet the overlay zone criteria for UDC Section 5.6, Airport Environs Zone (AEZ). Remove the specific reference to UDC 5.6.8.

4. COMMENT: 2-06.4.7.A.6 – The maximum FAR of the site is listed incorrectly and should be listed as 0.30 (UDC 5.6.8.B.1.c).

5. COMMENT: 2-06.4.7.A.6.a – If any additional applications are processed, provide the case number (if applicable) in the lower right corner of each sheet. Additionally, provide as a general note the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any.

6. COMMENT: 2-06.4.8.C – Clarify why the total right-of-way width of Old Vail Road is listed as 108.31 feet and not 90 feet as determined and effectuated by the Major Streets and Routes Plan.

7. COMMENT: 2-06.4.9.H.5.a – Automotive Service and Repair uses are within the Commercial Services use group and not the Industrial use group. The calculations are incorrectly provided for the number of required standard and accessible motor vehicle parking spaces. Additional spaces are required for this proposal unless the number of spaces provided is reduced through a Board of Adjustment variance or Individual Parking Plan.

8. COMMENT: 2-06.4.9.H.5.a – Review UDC 7.4.6.H.3 and correct the wheel stop location shown on the Typical Parking Detail on Sheet 7.

9. COMMENT: 2-06.4.9.H.5.d – The calculations are incorrectly provided for the number of short-term bicycle parking spaces required for Automotive Service and Repair uses. Show the location of the short-term bicycle parking facilities in accordance with all of UDC 7.4.9.B and .C. Show bicycle parking facilities fully dimensioned.

10. COMMENT: 2-06.4.9.H.5.d – Demonstrate how the proposed long-term bicycle locker complies with UDC 7.4.9.D.5.

11. COMMENT: 2-06.4.9.O – Per UDC Table 6.3-5.A, when a non-residential use is adjacent to a residential zone, the required perimeter yard is twice the height of the proposed building wall. Perimeter yards are also only measured from property lines.

12. COMMENT: 2-06.4.9.Q – The maximum building height permitted for Automotive Service and Repair uses in the I-2 zone is listed incorrectly and should be listed as 75 feet (UDC Table 6.3-5.B).

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
02/07/2024 CDRC Application Completeness Express REVIEW COMPLETED
02/13/2024 CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG.
02/13/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/13/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/13/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
03/01/2024 Fire New Construction REVIEW COMPLETED
02/12/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
02/07/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
02/12/2024 OK to Submit - Zoning Fast REVIEW COMPLETED