Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0224-00029
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/26/2024 | Commercial Plumbing | APPROVED | |||
| 03/08/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | March 8, 2024 WO#T106099 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: ADDITION OF PERIMETER FENCING TO EXISTING SITE TD-DEV-0224-00029 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 2/23/2024. There are existing facilities within the development which are depicted upon the plan; however, there do not appear to be any apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Martin Rodriguez (520) 991-5495 mrodriguez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power | ||
| 03/21/2024 | Site Engineering | APPROVED | |||
| 04/04/2024 | Site Landscape | APPROVED | LANDSCAPE COMMENTS: 1. Protect in place all existing plant material that may be impacted by the new gates. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
||
| 04/04/2024 | NPPO | NOT REQUIRED | |||
| 04/04/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 02/27/2024 | Fire New Construction | REQUIRES RESUBMIT | -Indicate the Ped gates will have knox key box. john.vincent@tucsonaz.gov 5203495581 |
||
| 03/25/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Wyatt Berger Lead Planner PROJECT: Fellowship Square Fencing Development Package (1st Review) TD-DEV-0224-00029 TRANSMITTAL DATE: March 25, 2024 DUE DATE: March 25, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM). Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is March 25, 2025. 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0224-00029, adjacent to the title block on all sheets. 2. COMMENT: 2-06.4.7.A.8.c – Keynotes 19 and 20 indicate a new access lane at the “northwest entrance.” As an expansion of the vehicular use area is proposed, provide a lot coverage calculation demonstrating that the total lot coverage of the development does not exceed 60% (see use-specific standard 4.9.7.J.8). 3. COMMENT: 2-06.4.9.H.5 – As the proposed fencing restricts ingress and egress, provide a back-up spur with a minimum depth and radius of three feet, as well as a three-foot dimension from the back-up spur and fencing (UDC 7.4.6.F.4). 4. COMMENT: 2-06.4.9.H.5 – Clarify whether Keynote 13 within the “northeast parking area” is an automatic gate. If an automatic gate is not proposed, demonstrate how vehicles approaching the gate turn around and maneuver within the existing vehicular use area. 5. COMMENT: 2-06.4.9.H.5 – Provide the width of the proposed access lane denoted as Keynotes 19 and 20 at the “northwest entrance.” 6. COMMENT: 2-06.4.9.H.5.a – Sheet 4 proposes to eliminate several standard and accessible motor vehicle parking spaces throughout the development. Update the total number of proposed motor vehicle parking spaces for the development on the cover sheet. 7. COMMENT: Please be aware a separate commercial demolition permit is required for the removal of the parking canopy and columns as noted on the site plan. If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 02/16/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/23/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 02/23/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 02/23/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 02/23/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time. | ||
| 02/21/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 02/21/2024 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 02/21/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 03/25/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |