Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.2
Permit Number - TD-DEV-0223-00151
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/22/2023 | Commercial Plumbing | APPROVED | |||
11/30/2023 | Site Engineering | APPROVED | |||
11/30/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
11/09/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Freeport Technology Campus Expansion Development Package (2nd Review) TD-DEV-0223-00151 TRANSMITTAL DATE: November 9, 2023 DUE DATE: December 2, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 06, 2024. 1. Zoning acknowledges that the abandonment of the easement is in progress. Once a building permit has been submitted and accepted Zoning will but a hold on the C of O until the abandonment is complete and approve the DP. COMMENT: 2-06.4.8.B – The EX 15.0’ WATER EASEMENT” shown to be abandoned will need to be abandoned prior to approval of this DP. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
10/31/2023 | CDRC Application Completeness | REVIEW COMPLETED |