Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - TD-DEV-0223-00141
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/22/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
02/22/2023 | CDRC Review Coordinator | PENDING ASSIGNMENT | |||
02/22/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
02/22/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
02/22/2023 | NPPO | PENDING ASSIGNMENT | |||
02/22/2023 | ROW Engineering Review | PENDING ASSIGNMENT | |||
02/22/2023 | Site Engineering | PENDING ASSIGNMENT | |||
02/22/2023 | Site Landscape | PENDING ASSIGNMENT | |||
02/22/2023 | Site Zoning | PENDING ASSIGNMENT | |||
02/22/2023 | OK to Submit - Landscape | REQUIRES RESUBMIT | 1.There must be a NPPO or NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval. 2. Missing the irrigation plan. Missing Landscape Construction Details. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10. 3. There will need to be a Commercial Rainwater Harvesting plan is required per UDC Technical Standards Manual – Section 4-01.3.0. and Section 5-01.0.0 Landscaping and Screening. Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
||
02/15/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
02/17/2023 | OK to Submit - Engineering | REVIEW COMPLETED | 1. Include the required SWPPP in the next submittal. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
02/21/2023 | OK to Submit - Zoning | REVIEW COMPLETED |