Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TD-DEV-0223-00141
Parcel: 10707003R

Address:
1109 W GLENN ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0223-00141
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/14/2024 OK to Submit - Engineering Fast APPROVED
05/16/2024 OK to Submit - Landscape Fast APPROVED
05/28/2024 Site Landscape APPROVED
05/21/2024 Site Zoning APPROVED
05/28/2024 CDRC Post Review Express PENDING ASSIGNMENT
05/22/2024 Site Engineering REQUIRES RESUBMIT The Design Standards for Stormwater Detention and Retention manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Per Chapter 4 Section 4.7.1 item 3 of the DSSDR, retaining walls proposed as the side wall of a detention or retention basin requires a report stating the assumptions of the soil in a saturated state shall be provided and sealed by an Arizona registered engineer. Please provide this report.

Lianne Evans
lianne.evans@tucsonaz.gov
05/09/2024 CDRC Application Completeness Express REVIEW COMPLETED
05/16/2024 CDRC Review Coordinator Express REVIEW COMPLETED External Reviewers not required. No further action is required from the customer at this time.
05/16/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
05/23/2024 ROW Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
05/24/2024 TW New Development Review REVIEW COMPLETED TD-DEV-0223-00141 - Development Package Review NEW v1 - 1109 W GLENN ST

1. Tucson Water accepts those revisions to the water system shown by the Revision 2 symbol (a numeral 2 within a triangle).

2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov