Permit Number: TD-DEV-0223-00138
Parcel: 140418630

Address:
3381 E WESTCO PL

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-0223-00138
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/08/2023 Site Landscape APPROVED
12/14/2023 CDRC Post Review Express PENDING ASSIGNMENT
12/14/2023 Site Engineering REQUIRES RESUBMIT See zoning comment regarding approved pedestrian circulation path and sidewalk materials.
Joshua Garcia
joshua.garcia@tucsonaz.gov
11/09/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Wyatt Berger
Lead Planner

PROJECT: El Dorado Transportation
Development Package (1st revision)
TD-DEV-0223-00138

TRANSMITTAL DATE: November 9, 2023

DUE DATE: December 10, 2023

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is now November 9, 2024.

1. COMMENT: 2-06.4.9.R – Per TSM 7-01.4.3.C.5, asphalt or asphaltic concrete may be used only for jogging paths, nature trails which are part of an accessible route, and pedestrian refuge areas which are not required to be connected to the pedestrian circulation path, as listed in Section 7-01.3.3.B. Ensure the required sidewalk perpendicular to the motor vehicle parking spaces meets one of the composition criteria of TSM 7-01.4.3.C.

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or (520) 837-4951.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
11/01/2023 CDRC Application Completeness Express REVIEW COMPLETED
11/09/2023 CDRC Review Coordinator Express REVIEW COMPLETED External Reviewers not required.
No further action is required from customer at this time.
11/30/2023 Fire New Construction REVIEW COMPLETED
11/03/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
11/07/2023 OK to Submit - Landscape Fast REVIEW COMPLETED
11/02/2023 OK to Submit - Zoning Fast REVIEW COMPLETED