Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0223-00128
Parcel: 107132820

Address:
2617 N 1ST AV

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - TD-DEV-0223-00128
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/23/2024 Zoning Modifications - IPP APPROVED IPP approved to allow the reduction from 87 to 29 on-site vehicle parking spaces subject to the following conditions:

A. Outdoor loudspeakers or music (live or recorded) are not permitted.
B. The letter dated May 23, 2023 from Mesch Clark & Rothschild, and any parking agreements shall be submitted with the development package (Please note, the revised conditions letter dated June 5, 2023 from Mesch Clark & Rothschild replaces the letter dated May 23, 2023).
06/03/2024 CDRC Post Review Express PENDING ASSIGNMENT
06/03/2024 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Wyatt Berger
Lead Planner

PROJECT: Nugget Tavern
Development Package (2nd Review)
TD-DEV-0223-00128

TRANSMITTAL DATE: June 3, 2024

DUE DATE: May 19, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. The new one-year expiration date is June 3, 2025.

1. COMMENT: 2-06.4.7.A.4 – Include the existing Single Family, Detached use within zoning and land use note number six.

2. COMMENT: 2-06.4.7.A.6 – Provide a general note on the cover sheet that states, “THE PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE CRITERIA OF UDC SEC. 5.4, MAJOR STREETS & ROUTES SETBACK ZONE (MS&R).

3. COMMENT: 2-06.4.7.A.6.a – Under “PARKING NOTES” on Sheet C1.0, provide a statement that the project meets the criteria/conditions of Individual Parking Plan approval, the date of approval, what was approved, and the conditions of approval.

4. COMMENT: 2-06.4.9.H.5 – Per UDC Table 7.4.6-2, the minimum width of a two-way PAAL is 24 feet. Further, per UDC 7.4.6.F.2.b, access lanes and PAALs must be set back at least two feet from a wall, screen, or other obstruction over six inches.

A variance granted by the Board of Adjustment is required to reduce the PAAL width to 16.84’ as shown on the development package drawings. Zoning recommends providing a one-way PAAL and reducing the size of the outdoor patio to allow a Parking Design Modification Request (PDMR) to be pursued. Please note that a PDMR cannot eliminate any of the above requirements.

5. COMMENT: 2-06.4.9.H.5.d – Per UDC 7.4.3.E.3, expansions are cumulated over time from May 9, 1990, for the application of bicycle parking regulations. As such, the proposed outdoor patio expansion requires two short- and two long-term bicycle parking spaces.

Ensure the required bicycle parking facilities comply with UDC 7.4.9. Additionally, provide, as a note, calculations for the number of required and proposed bicycle parking spaces.

6. COMMENT:2-06.4.9.I – Based on conversations with the Department of Transportation and Mobility (DTM), 1st Avenue is not proposed to be widened. Remove the future right-of-way line from Sheets C1.0 and C2.0.

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
04/19/2024 CDRC Application Completeness Express REVIEW COMPLETED
04/23/2024 Fire New Construction REVIEW COMPLETED
05/30/2024 ROW Engineering Review REVIEW COMPLETED Expansion does not exceed 25%. Civil improvements not required. Recommended to replace asphaltic sidewalk and driveways with concrete to bring up to COT standards.