Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0126-00025
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/20/2026 | NPPO Standard | APPROVED | Site landscape and native plant preservation were reviewed and approved for this phase 3 under the related development package, TD-DEV-0125-00004. TD-DEV-0125-00004 is attached to this submittal for reference. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov |
||
| 02/20/2026 | Site Landscape Standard | APPROVED | Site landscape and native plant preservation were reviewed and approved for this phase 3 under the related development package, TD-DEV-0125-00004. TD-DEV-0125-00004 is attached to this submittal for reference. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov |
||
| 02/20/2026 | Fire New Construction Standard | NOT REQUIRED | |||
| 02/25/2026 | ROW Engineering Review Standard | REQUIRES RESUBMIT | PIA agreement will be required for new public streets. Apply under subrecords. Show radiuses for curb returns. |
||
| 02/10/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0126-00025 (1st Review) Project: PRIVATE GRADING & DRAINAGE PLANS FOR LA ESCALERA PHASE 3, LOTS 383-738 Location: 7604 S PASEO GRAN ESCALERA Review Date: 2/9/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Related cases: TD-DIV-0925-00086 (Final Plat), TD-DEV-0125-00004 (Tentative) *This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. * City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Review Comments: 1. Provide the development package case number, TD-DEV-0126-00025, adjacent to the title block on all sheets. 2. Provide the Final Plat case number, TD-DIV-0925-00086, adjacent to the title block on the cover sheet. 3. Remove the note about Drywells from the plan set as drywells will not be approval for this development. 4. As the plans show the 100-year floodplain limits extending to portions of “Common Area B” on sheet 6, a separate floodplain use permit will be required for work within a floodplain. 5. The geotechnical report provided talks about infiltration done for the basin/common areas, please provide the infiltration testing results as they do not appear to be included in the current report file. FOR PERMIT RESUBMISSION, IT IS REQUIRED THAT: Corrected/Revised Plan set and a detailed response letter document that clearly shows how you addressed all of Site Engineering’s and other reviewers’ comments for the completed review cycle. If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 02/23/2026 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: Private Grading/Drainage Plan for La Escalera Phase 3 - 7604 S. Paseo Gran Escalera Tucson, AZ 85747 Development Package (1st Review) TD-DEV-0126-00025 TRANSMITTAL DATE: 2/23/2026 DUE DATE: 2/20/2026 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 29, 2027. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.3.0 FORMAT REQUIREMENTS CONTENT REQUIREMENTS 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.2.C - The number of proposed lots and common areas are to be noted. If the subdivision is a Flexible Lot Development (FLD), a condominium, or a similar type of residential subdivision utilizing special provisions of the UDC, it shall be so noted; 1. COMMENT: 2-06.4.2.C – The lot numbers provided on this grading plan do not reflect the lot numbers provided in the Tentative Plat (TD-DEV-0125-0004). Please explain the discrepancy. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 2. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-0126-00025, adjacent to the title block on each sheet. Also, please provide the Final Plat case number (TD-DIV-0925-00086) as noted by the standard above. 2-06.4.6 - If the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced-scale map of the PAD on the first sheet, indicating the location of the portion being developed. 3. COMMENT: 2-06.4.6 – As this site is located within PAD-38, please include a reduced scale map of the PAD on the first sheet as noted by the standard above. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned. 4. COMMENT: 2-06.4.9.H.4 – Indicate if the streets are public or private as noted by the standard above. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations *** If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 01/27/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 01/30/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | Grading permit requires external reiviewers TEP and Addressing. | ||
| 02/18/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 02/02/2026 | External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | Good afternoon, Pima County Addressing does not need to review TD-DEV-0126-00025. Thank you, David Wilging Planner I - Addressing Division Pima County Development Services 201 N. Stone Avenue 1st Floor Tucson, Arizona 85701 520-724-6381 |
||
| 02/10/2026 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | Tucson Electric Power Co., (TEP) has reviewed and has no objections to the PRIVATE GRADING & DRAINAGE PLANS FOR LA ESCALERA PHASE 3 submitted for review 1/30/2026. For final plat approval, all required easements must be dedicated by the plat. Public Utility dedication for all common areas must be included in the final plat dedication. Thank you, Liza Castillo Right-of-Way Consultant for Tucson Electric Power Co. Land Resources (520) 965-4030 tepdevrev@tep.com |
||
| 01/28/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 01/29/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 01/30/2026 | ROW Review | REVIEW COMPLETED |