Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-0126-00003
Parcel: 11720019C

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0126-00003
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Design Review Standard PENDING ASSIGNMENT
N/A External Reviewers - COT Environmental Services Standard PENDING ASSIGNMENT
N/A Fire New Construction Standard PENDING ASSIGNMENT
N/A ROW Engineering Review Standard PENDING ASSIGNMENT
N/A Site Landscape Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
03/12/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-0126-00003 (2nd Review)
Project: HSL Hyatt Hotel (formerly the Hotel Arizona) Development Package
Location: 181 W BROADWAY BL
Review Date: 3/12/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Related Cases:
*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
Site Engineering Review Comments:
1. Sight Visibility Triangles (SVT) – Near Side & Far Side (Previous Comment #1 – Not Resolved) The near-side SVT along Broadway Blvd is currently shown as 185 feet. As Broadway Blvd is classified as an Arterial roadway, the required near-side SVT is 345 feet. Please revise all SVTs along this frontage to reflect the applicable arterial standard.
a. Additionally, the far-side SVT for the westernmost access entrance remains unaddressed. As a left-turn movement from the right-of-way into this entrance is possible, a 125-foot far-side SVT is required. Please demonstrate compliance accordingly.
2. Previous comment # 6 not addressed. It must be demonstrated through infiltration testing that the basin proposed falls within compliance with DSSDR 4.5.1 Storage standards that the basin drains down within the required 12hours as the basin is shown to have a max depth of 1.2’. As the comment response detailed, the timeline for the future structure is unknown, and therefore the lifetime of this basin is unknown, which means it will still be required to abide by the standards set forth.
3. Per DSSDR Section 4.4.1.1, basins constructed below natural grade shall provide a minimum freeboard of 6 inches. Please demonstrate that the proposed basin in the southeast corner of the site meets this requirement. Revise plans and/or details as necessary.
4. The bridge shown in Keynote #21 is proposed to span directly over an Access Lane. Per UDC Section 7.4.6.E.2, a minimum vertical clearance of 15 feet is required above an Access Lane. Please provide a construction detail demonstrated that this minimum clearance is achieved.

If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
03/12/2026 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED March 12, 2026
WO#T173616
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: HSL Hyatt Hotel
TD-DEV-0126-00003
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 3/9/2026. There are existing facilities within the development which are
depicted upon the plan. There are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
03/10/2026 Historic REVIEW COMPLETED Applicant has created a sub record. PRS and DRB meetings have not been held yet to consider proposed project.
03/18/2026 Zoning Modifications - Variance Standard REVIEW COMPLETED