Permit Number: TD-DEV-0125-00025
Parcel: 13507330G

Address:
7510 E 22ND ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0125-00025
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/06/2025 CDRC Post Review Express PENDING ASSIGNMENT
02/24/2025 Commercial Plumbing Standard REQUIRES RESUBMIT An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit.
03/06/2025 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT TEP will be added to next round as no response was received.
02/28/2025 NPPO Standard REQUIRES RESUBMIT The NPPO will be approved once the activity number is added to the plan. TD-DEV-0125-00025

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
02/14/2025 ROW Engineering Review Standard REQUIRES RESUBMIT TD-DEV-0125-00025 • 7510 E 22ND ST

1. In accordance with Section 10-01.3.3 of the Technical Standards Manual, a pedestrian circulation path, as outlined in Section 10-01.4.0, must be established along the full street frontage of the development. This requirement includes bringing the curb access ramp at the southeast corner of 22nd St and Prudence Rd, as well as the existing curb access ramps at the driveway entrances, into compliance. Additionally, the cross slope of the pedestrian circulation path within the driveways must not exceed a 1:48 (2.1%).

If you have any questions, please contact Richard Leigh at Richard Leigh at richard.leigh@tucsonaz.gov
02/26/2025 Site Engineering Standard REQUIRES RESUBMIT 1. Show a complete pedestrian circulation path including out to E 22nd St.
2. The trash enclosure detail doesn't match TSM Section 8-01 Figure 3A, revise or submit for a TSMR.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
02/28/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: RAZE AND REBUILD OF EXISTING COMMERCIAL SITE - PROPOSED 5,200 SF C-STORE WITH 6 PUMPS
ACTIVITY NO: TD-DEV-0125-00025
ADDRESS: 7510 E 22ND ST
ZONING: C-1 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape/NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Can your typical note be added to the rainwater harvesting plan to see the civil grading plan and details for construction of the water harvesting basins?

2. Provide the development package case number, TD-DEV-0125-00025, adjacent to the title block on all sheets. 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
02/25/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Circle K - 7510 E 22ND ST
Development Package (1st Review)
TD-DEV-0125-00025

TRANSMITTAL DATE: February 25, 2025

DUE DATE: February 24, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is January 30, 2026.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0125-00025, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.6.a – Remove the reference to “DAVIS MONTHAN AIR FORCE BASE (DM AFB) VICINITY OVERLAY ZONE, SUBJECT TO UDC ARTICLE 5.6.11” from Zoning and Land Use Note 5 as DM Vicinity show on MapGuide is not part of the AEZ.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

3. COMMENT: 2-06.4.8.B – There are several easements shown to be abandoned by separate instrument. These easements will need to be abandoned prior to approval of the DP.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

4. COMMENT: 2-06.4.9.E - As it appears that some type of land split/reconfiguration is proposed this split/reconfiguration will need to be processed and approved prior to this DP.

5. COMMENT: 2-06.4.9.H.5 – The 40’ PAALs shown to the east and west of the proposed canopy and the 43’ PAAL shown to the north of the proposed canopy, by definition are not PAALs and should be access lanes.

6. COMMENT: 2-06.4.9.H.5.a – There appears to be a patio proposed along the west side of the proposed building. Per UDC Article 7.4.3.F.4 the area of any outdoor areas necessary to provide the service to the public or conduct the activity, such as outdoor eating areas are included in the gross floor area for parking calculations.

7. COMMENT: 2-06.4.9.H.5.d – Show the proposed long-term bicycle parking on the plan and provided a long-term bicycle parking detail that clearly demonstrates how the requirements of UDC Article 7.4.9.D are met.

8. COMMENT: 2-06.4.9.H.5.d – Clearly demonstrate how the requirements of UDC Article 7.4.9.B.1.e are met for the short-term bicycle parking.

9. COMMENT: 2-06.4.9.O – The setbacks shown on sheet 5, shown to the south property line are not correct. Per UDC Table 6.3-4.A, C-1 Zone, Nonresidential Use to a Nonresidential Zone the required perimeter yard setback is 0’-0” not 1 ½ (H).

10. COMMENT: 2-06.4.9.R – Clearly demonstrate that the requirements of TSM Section 7-1.4.1.A are met out to 22nd St.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
01/24/2025 CDRC Application Completeness Express REVIEW COMPLETED
01/31/2025 CDRC Review Coordinator Express REVIEW COMPLETED CDRC added TEP PAG, USPS, SWG to the workflow. Review request email sent to TEP. FYI email sent to PAG, USPS, SWG.
01/31/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/31/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/31/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/14/2025 Fire New Construction Standard REVIEW COMPLETED Based on the Information provided TFD has no comments at this time.
01/31/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
01/30/2025 OK to Submit - Zoning Fast REVIEW COMPLETED