Permit Number: TD-DEV-0124-00024
Parcel: 11617004A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-0124-00024
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/18/2024 Commercial Plumbing APPROVED
03/06/2024 External Reviewers - Tucson Electric Power (TEP) APPROVED March 6, 2024 WO#T104866 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: New 200 Amp Electrical Service TD-DEV-0124-00024 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 2/9/2024. There are no existing facilities within the development and thus there are no apparent conflicts for customer’s overhead service on a customer owned service pole. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our land Resources Department, TEPDEVREV@tep.com. Should you have any technical questions, please contact the area designer, Carlos Nunez (520) 390-6379 cnunez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power
03/07/2024 Site Engineering APPROVED
02/26/2024 NPPO NOT REQUIRED
02/26/2024 Site Landscape NOT REQUIRED Per UDC 4.9.4 -M #7 d & e 'landscaping (UDC Article 7.6) and stormwater retention detention standards (TSM Sect 4-03-.0.0) do not apply.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
03/18/2024 CDRC Post Review Express PENDING ASSIGNMENT
03/08/2024 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Nathan Herrera
Planner

PROJECT:
Development Package (1st Review)
TD-DEV-0124-00024

TRANSMITTAL DATE: March 08, 2024

DUE DATE: March 10, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is 01/30/2025.

2-06.4.0 Content Requirements:

1. 2-06.4.3 - The administrative street address and relevant case numbers (development package document,) shall be provided adjacent to the title block on each sheet.

COMMENT: Provide the permit number, TD-DEV-0124-00024, in the Title Block.

2. 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage.

COMMENT: Provide the above information in the Notes section.

3. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

COMMENT: Food Court in the C2 zone has the following Use Specific Standards UDC 4.9.4.M.1, .6, & 7, 4.9.13.P, add these standards to Note 4.

COMMENT: Note 9 states “Central Grease Trap Not Applicable”. Per Use Specific Standard 4.9.4.M.7.B, states one is required. Identify the central grease trap on the site plan.


2-06.4.8 - Existing Site Conditions

a. 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system.

COMMENT: The site property boundaries do not look accurate. Provide the correct property dimensions and clearly show the property lines on the site plan.


2-06.4.9.H Proposed Traffic Circulation

4. 2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

a. 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

COMMENT: Parking spaces must be at least 8.5 feet by 18 feet.

COMMENT: Two- way PAALS must be at least 24 feet wide. The fence openings as shown on the site plan do not meet this requirement and will need to be widened to allow for 24 feet width of access.

5. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown.

COMMENT: Provide a dimension for the proposed portable restroom. Per UDC Table 6.3-4.A, A nonresidential use in adjacent to a residential zone requires a minimum setback of 1 ½ time the height of the building wall setback. The portable restroom must meet this requirement.

6. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

COMMENT: If there are to be any shade structures over the seating area and/or foot truck locations provide the height on the site plan.

COMMENT: Aerial imagery shows a shed in the northwest corner of the property. Show it on the site plan. If the shed is to be demolished or moved label it on the site plan.



If you have any questions about this transmittal, please contact me at Nathan.Herrera@tucsonaz.gov or at 520-837-4894.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised Development Package along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
02/08/2024 CDRC Application Completeness Express REVIEW COMPLETED No registrant stamp on plans
02/09/2024 CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent per ADOT & TEP. CDRC sent FYI email to PAG, USPS, SWG
02/23/2024 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review.
02/09/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/09/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/09/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
02/09/2024 Fire New Construction REVIEW COMPLETED
02/09/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
03/11/2024 ROW Engineering Review REVIEW COMPLETED No Comments

David Stiffey