Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TD-DEV-0124-00018
Parcel: 110113620

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0124-00018
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/06/2024 Commercial Plumbing APPROVED
02/29/2024 Site Engineering APPROVED
02/23/2024 NPPO NOT REQUIRED
02/23/2024 Site Landscape NOT REQUIRED
03/06/2024 CDRC Post Review Express PENDING ASSIGNMENT
02/06/2024 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Wyatt Berger
Lead Planner

PROJECT: Roadhouse Entertainment Center
Development Package (1st Review)
TD-DEV-0124-00018

TRANSMITTAL DATE: February 6, 2024

DUE DATE: March 3, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is February 6, 2025.

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0124-00018, adjacent to the title block.

2. COMMENT: 2-06.4.4.C – Show section corners on the project-location map. Section, township, and range; section corners; north arrow; and the scale will be labeled.

3. COMMENT: 2-06.4.7.A.4 – The uses provided within General Note 4 are not uses defined within the Unified Development Code. Provide the UDC defined uses and list all relevant use-specific standards. Additionally, the “entertainment center” is likely best classified as a Commercial Recreation land use class rather than an Entertainment land use class.

4. COMMENT: 2-06.4.7.A.6.a – List the relevant annexation, rezoning, and development package case numbers within the title block.

5. COMMENT: 2-06.4.8.A – Provide property boundary information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system.

6. COMMENT: 2-06.4.8.B – Ensure all existing easements are shown on the site plan. If any easements exist, include the recordation information, location, width, and purpose of the easements.

7. COMMENT: 2-06.4.9.F – Show all existing zoning classifications on and adjacent to the site (including across Grant and Swan roads), with the zoning boundaries clearly defined.

8. COMMENT: 2-06.4.9.H.5.a – The number of required motor vehicle parking spaces for the site is incorrect. Per UDC 7.4.3.G, when the calculation of required motor vehicle spaces results in a fractional number, a fraction of one-half or more is adjusted to the next higher whole number, and a fraction of less than one-half is adjust to the next lower number.

9. COMMENT: 2-06.4.9.H.5.c – Clarify the gross floor area of the proposed restaurant/bar use. One Type A loading zone is required for restaurants and bars over 5,000 square feet gross floor area (UDC Table 7.5.5-A).

10. COMMENT: 2-06.4.9.H.5.d – Provide the number of required and proposed short- and long-term bicycle parking spaces for the change of use and new patio. Refer to UDC Table 7.4.8-1 for the number of spaces required.

11. COMMENT: 2-06.4.9.R – Ensure the existing concrete sidewalk maintains a minimum width of four feet and is installed to avoid any obstruction which decreases the minimum width to less than four feet (TSM 7-01.4.3.A).

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
01/25/2024 CDRC Application Completeness Express REVIEW COMPLETED No registrant stamp on plans and additional information tab in Energov is blank.
02/05/2024 CDRC Review Coordinator Express REVIEW COMPLETED External Reviewers not required. No further action is required from customer at this time.
02/27/2024 Fire New Construction REVIEW COMPLETED
01/30/2024 OK to Submit - Engineering Fast REVIEW COMPLETED
01/30/2024 OK to Submit - Landscape Fast REVIEW COMPLETED
02/05/2024 OK to Submit - Zoning Fast REVIEW COMPLETED
02/29/2024 ROW Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov