Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0124-00014
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/08/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 10/01/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Wyatt Berger Lead Planner PROJECT: BICAS PV System Development Package (2nd Review) TD-DEV-0124-00014 TRANSMITTAL DATE: October 1, 2024 DUE DATE: October 17, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM). Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. The new one-year expiration date is October 1, 2025. 1. COMMENT: 2-06.4.7.A.6 – As the IID will not be used for this project, remove the reference to the Greater Infill Incentive District under "Zoning Notes." 2. COMMENT: 2-06.4.7.A.6.a – Zoning acknowledges that a Design Development Option (DDO) application has been submitted. If the requested DDO is approved, provide the case number in the lower right corner of each sheet. Additionally, as a general note provide the type of application processed, a statement that the project meets the conditions of the application, the case number, date of approval, what was approved, and the conditions of approval, if any. 3. COMMENT: 2-06.4.9.O – Per UDC 6.4.5.C.2.b, for nonresidential and multifamily development abutting a local street, the minimum required street perimeter yard is 20 feet, as measured from the street property line. The proposed street perimeter yard is 6'-1" as measured from the post supporting the canopy, and 2’-6” as measured from roof overhang to the east property line. Zoning cannot approve TD-DEV-0124-00014 until the DDO process has been completed. If you have any questions about this review, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 10/08/2024 | Zoning Modifications - DDO | REQUIRES RESUBMIT | The DDO application has been accepted for processing. Please allow 4-6 weeks for this process. If the application is approved, please include in your required comment response letter the following information: DDO case number, the request, and condition(s) of approval. If you have questions, please email Mark.Castro@tucsonaz.gov | ||
| 09/17/2024 | CDRC Application Completeness Express | REVIEW COMPLETED |