| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/29/2024 | Commercial Plumbing | APPROVED | |||
| 02/26/2024 | External Reviewers - Pima County Addressing | APPROVED | Good afternoon, Pima County Addressing approves TD-DEV-0124-00012. The ADU will be identified as Unit 1 and the main home as Unit 2. Nicholas Jordan Site Review Project Manager – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
| 01/31/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | Tucson Electric Power Co., (TEP) has reviewed and has no objection to plat submitted January 25th, 2024. Costs for removing or relocating existing TEP facilities will be billable to the developer. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument. Respectfully, Tucson Electric Power Co. Land Resources Department |
||
| 02/23/2024 | NPPO | APPROVED | |||
| 02/23/2024 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
| 02/23/2024 | Site Zoning | APPROVED | |||
| 02/23/2024 | Site Landscape | NOT REQUIRED | |||
| 02/29/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 02/23/2024 | Site Engineering | REQUIRES RESUBMIT | 1. The proposed casita is in a regulatory floodplain and will need to be elevated one foot above the base flood elevation of 2587.30 feet NAVD88. Please also submit for a floodplain use permit with elevation certificate in the TDC Online portal. For reference: The elevation of the building must be certified by a registered land surveyor at two points during building: first before the pre-slab inspection, when the foundation forms are up, and second when construction is nearly complete, before any final inspections can take place. There will be holds put on the building permits that prevent these inspections until the elevation certificates are submitted to the floodplain use permit in the TDC Online portal. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 01/17/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 01/25/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per Addressing & TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 01/25/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 01/25/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 01/25/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 02/16/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 01/24/2024 | OK to Submit - Engineering Fast | REVIEW COMPLETED | The site is located in a regulatory floodplain and will require a floodplain use permit before issuance. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 01/19/2024 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 01/24/2024 | OK to Submit - Zoning Fast | REVIEW COMPLETED | 1. Per UDC 6.6.3.C, detached accessory buildings, including accessory dwelling units, are not permitted in the buildable area extending the full width of the lot between the principal building and the front street lot line. Loran Shamis Loran.Shamis@tucsonaz.gov |