Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-0124-00003
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/11/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
04/11/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Comment not addressed. [Initial comment: Provide the size of the water meter serving this property and the total water demand that will be served by the water meter. Reference: Section 107.2.1, IBC 2018.] | ||
04/09/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 3rd SFR – 1330 E. 10th St. Development Package (2nd Review) TD-DEV-0124-00003 TRANSMITTAL DATE: April 9, 2024 DUE DATE: April 11, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Checklist for Minor Changes to Commercial/Industrial Sites. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is January 10, 2025. GENERAL NOTES The following general notes are required. Additional notes specific to each plan are required where applicable. 2. This comment was not fully addressed. Under General Note 3 you list “ACCESSORY DWELLING UNIT” and under Project Data, SQUARE FOOTAGE” you list ‘NEW 3RD SFR”, clarify what you are proposing. As a general note identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. The application states “ADU” but the plan shows this as a 3rd SFR. If this is an ADU the proposed 792 S.F. exceeds the allowed 10%, UDC Article 6.6.3.B.5, and will require a Board of Adjustment. If this is a third SFR additional comments may be forth coming. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. The following comments still apply until the comment above is addressed correctly. 1. Until the proposed use is clarified Zoning cannot verify parking requirements. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided. 2. Until the proposed use is clarified Zoning cannot verify bicycle parking requirements. If this is a 3rd SFR bicycle parking will be required based on multifamily requirements. 6. Unit the use is clarified Zoning cannot determine perimeter yard setback requirements. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter. |
||
03/11/2024 | CDRC Application Completeness | REVIEW COMPLETED |