Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.3
Permit Number - TD-DEV-0123-00124
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/16/2023 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
06/16/2023 | Site Engineering | APPROVED | 1. Waiting on Andy confirmation | ||
06/16/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/26/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Stockett Tile and Granite Development Package (5th Review) TD-DEV-0123-00124 TRANSMITTAL DATE: May 26, 2023 DUE DATE: June 22, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is January 31, 2024. 1. The provided copy of the Covenant Regarding Development and Use of Real Property references “DP21-0340” in Recital B. The correct case number that needs to be shown is the current DP #, “TD-DEV-0123-00124”, as DP21-0340 was withdrawn. A new Covenant will need to be recorded showing the correct case number. Recordation documents must be submitted as an attachment to this development package before approval. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. If you have any questions about this transmittal, please contact Nathan Herrera at Nathan.herrera@tucsonaz.gov or at 520-837-4894. |
||
05/23/2023 | CDRC Application Completeness | REVIEW COMPLETED |