Permit Number: TD-DEV-0123-00111
Parcel: 13728107B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - TD-DEV-0123-00111
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2023 Commercial Plumbing APPROVED
05/03/2023 Site Landscape APPROVED
05/18/2023 CDRC Post Review Express PENDING ASSIGNMENT
05/09/2023 External Reviewers - Pima County Addressing REQUIRES RESUBMIT Good afternoon,
Pima County Addressing is returning TD-DEV-0123-00111 La Sombra Del Mesquite Apartments for corrections. Please see the plan for comments.

Thank you
Nicholas Jordan
Site Review Project Manager - Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
05/16/2023 Site Engineering REQUIRES RESUBMIT 1. By The COT amendments to the PC Retention/Detention Manual, bleed pipes may not be used, unless a perc test is completed to show retention is not feasible due to poor soil condition.
2. Waste stream calculation calls out 2 3 cy dumpsters (one for recycling and one for solid waste). Only a single enclosure is provided on site, please provide enclosure space for both dumpsters.
3. The proposed back-up spur on the NW lot must have a minimum of 3' clear space between back of spur and any obstruction over 6" (UDC 7.4.6.F.4.c)

Scott Haseman
scott.haseman@tucsonaz.gov
04/25/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: La Sombra Del Mesquite Apartments
Development Package (2nd Review)
TD-DEV-0123-00111

TRANSMITTAL DATE: April 25, 2023

DUE DATE: May 19, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is January 26, 2024.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

1. This comment was not fully addressed. Per UDC Article 7.4.6.F.4.c A minimum distance of three (feet must be provided between the back of spur and any wall, screen, or other obstruction over six inches in height. The total distance for back-up spur to the trash location enclosure should be 6’-0”. COMMENT: 2-06.4.9.H.5 – As a back-up spur is required at the end of a row of parking if no ingress or egress is provided at that end, UDC Article 7.4.6.F.4.a, Clearly demonstrate that the requirements met to the propose trash collection location.

2. The bicycle parking space calculation is not correct. Per UDC Table 7.4.8-1: Minimum Required Bicycle Parking Spaces, RESIDENTIAL USE GROUP, Multifamily Dwellings and Group Dwelling, the calculation is based on the total number of bedrooms not units. COMMENT: 2-06.4.9.H.5.d – Provide a short- & long-term bicycle parking space calculation that provides the ratio used, and the number of required and provided.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
04/19/2023 CDRC Application Completeness Express REVIEW COMPLETED
05/10/2023 Fire New Construction REVIEW COMPLETED