Permit Number: TD-DEV-0123-00102
Parcel: 125101380

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0123-00102
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/20/2025 Commercial Plumbing Standard APPROVED
11/10/2025 Site Engineering Standard APPROVED
11/21/2025 Site Landscape Standard APPROVED
11/19/2025 Site Zoning Standard APPROVED
11/21/2025 NPPO Standard NOT REQUIRED
11/18/2025 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
November 18, 2025
WO#T168331
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: El Con / Chick-fil-A
TD-DEV-0123-00102
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 11/1/2025. There are existing facilities within the
development which are not depicted upon the plan. NO APPARENT CONFLICTS WITH
TEP UNDERGROUND LINES. Further: TEP EXISTING EASEMENTS NEED TO BE
SHOWN CORRECTLY ON THE PLAN -
Docket-11357 Page-443, Docket-11357 Page-467, Docket-11357 Page-491, Docket12000 Page-2741. TEP easement - Docket-11842 Page-3926 as released by Docket12000 Page-2752.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
10/31/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added: TEP, SWG USPS, and PAG to the workflow. Review request email sent to TEP, and FYI email sent to, SWG USPS PAG.
10/31/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
10/31/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
10/31/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
11/19/2025 Fire New Construction Standard REVIEW COMPLETED
10/27/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
10/28/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
11/12/2025 ROW Engineering Review Standard REVIEW COMPLETED No Comments at this time per the prior review by DTM and no changes have been made within DTM right of way