Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - TD-DEV-0123-00102
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/24/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
01/24/2023 | CDRC Review Coordinator | PENDING ASSIGNMENT | |||
01/24/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
01/24/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
01/24/2023 | NPPO | PENDING ASSIGNMENT | |||
01/24/2023 | ROW Engineering Review | PENDING ASSIGNMENT | |||
01/24/2023 | Site Engineering | PENDING ASSIGNMENT | |||
01/24/2023 | Site Landscape | PENDING ASSIGNMENT | |||
01/24/2023 | Site Zoning | PENDING ASSIGNMENT | |||
01/24/2023 | OK to Submit - Zoning | REQUIRES RESUBMIT | 1. There is an active development package (DP21-0242) in issued status that needs to be completed prior to receiving and reviewing another development package. Either complete the steps to complete DP21-0242 and resubmit once the case has been completed; or submit a revision to DP21-0242 to include the new proposed development. 2. Correct the sheet index to reflect the total number of pages or remove the pages beyond what is listed in the sheet index. 3. The site has split zoning and is zoned both C-1 and C-2 and the use is food services. Include the applicable use specific standards C-1: 4.9.4.M.1 & 5 and 4.9.13.O; and C-2: 4.9.4.M.1 and 4.9.13.P. Loran Shamis Loran.Shamis@tucsonaz.gov |
||
01/17/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
01/19/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
01/20/2023 | OK to Submit - Landscape | REVIEW COMPLETED |