Permit Number: TD-DEV-0123-00102
Parcel: 125101380

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0123-00102
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/14/2024 Commercial Plumbing APPROVED
07/26/2024 ROW Engineering Review APPROVED DTM has no comments
08/16/2024 NPPO NOT REQUIRED
09/11/2024 CDRC Post Review PENDING ASSIGNMENT
09/11/2024 External Reviewers - Tucson Electric Power (TEP) REQUIRES RESUBMIT TEP response comments have not been received, reminder emails for request to review have been sent. Will require a resubmit so that TEP review can be added onto the next review cycle.
08/12/2024 Site Engineering REQUIRES RESUBMIT 1. Sheet 6 shows a 1% slope for the waste enclosure apron. The waste enclosure apron shall have a min 2% slope per TSM 8.
2. Detail E on Sheet 11 shows a refuse enclosure that does not meet minimum requirements of TSM 8. Reference figure 3A and ensure adequate clear space & other parameters are met.
3. Sheet 13 states “Fill in area with Lantana Montevidensis due to new construction” but none of the sheets in the plan set show any work being done in this location. Please include this area in the plan set sheets to explain proposed demolition & construction.

Please contact Chris Arrington at chris.arrington@tucsonaz.gov if you have any questions
08/16/2024 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: REMODEL OF EXISTING CHICK-FIL-A SITE
ACTIVITY NO: TD-DEV-0123-00102
ADDRESS/PARCEL: 3605 E BROADWAY BL/125101380
ZONING: C-2 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:
1. Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.

2. Provide the development package case number, TD-DEV-0123-00102, adjacent to the title block on all sheets. 2-06.4.3

3. The proposed planting areas shall be depressed 6 to 9-inches to maximize rainwater harvesting into those areas. Currently the two main planting areas (north and northeast) do not call out the depressed landscape beds. Indicate with callouts and notes that these areas are depressed. Coordinate the landscape plan and the grading plan with contours to show the depressions. Add reference to the civil grading plan and details for construction of the basins.

4. A rainwater harvesting basin schematic detail is not a requirement but adding it to the details sheet would be a nice addition for construction clarity. If you would like to add the schematic detail and need an example, please reach out and I will email a couple of versions of the schematic for reference.

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
08/12/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Chick-Fil-A – Drive Through
Development Package (3rd Review)
TD-DEV-0123-00102

TRANSMITTAL DATE: August 12, 2024

DUE DATE: August 12, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 15, 2024.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0123-00102 on sheets 13 – 18 and provide these case numbers C9-56-01, C9-74-34, C9-88-12 adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.4 – The existing and proposed use, Food & Beverage Sales, listed under Zoning and Land Use Note 4 is not correct. This use should be listed as Food Service: Excluding Soup Kitchens, subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/12/2024 CDRC Application Completeness REVIEW COMPLETED
07/25/2024 CDRC Review Coordinator REVIEW COMPLETED CDRC added TEP, PAG, USPS, SWG to the workflow. Review request email sent to TEP. FYI email sent to PAG, USPS, SWG.
07/25/2024 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/25/2024 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/25/2024 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/08/2024 Fire New Construction REVIEW COMPLETED
07/23/2024 OK to Submit - Engineering REVIEW COMPLETED
07/23/2024 OK to Submit - Zoning REVIEW COMPLETED