Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - TD-DEV-0123-00101
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/10/2023 | Site Landscape | APPROVED | |||
02/10/2023 | NPPO | NOT REQUIRED | |||
03/02/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
02/23/2023 | Commercial Plumbing | REQUIRES RESUBMIT | The rim elevation of the next upstream sanitary manhole (2488.00’) is less than 12” below the first floor elevation (2488.10). Provide a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. | ||
03/02/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Include the first flush calculations in the drainage report, calcs for the required volume and the calcs for the achieved volume. The basins and drainage routing look good, we just need to have the calcs documented in the report. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
03/01/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Freddy’s at The Bridges Development Package (1st Review) TD-DIV-0123-00101 TRANSMITTAL DATE: March 01, 2023 DUE DATE: March 02, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is January 23, 2024. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DIV-0123-00101, adjacent to the title block on all sheets. 2. COMMENT: 2-06.4.7.A.8.d - The Bridges Tracking table is not complete, contact Nicholas Ross for a current copy of the Excel file. Sub Area “A” is missing DPs DP21-0138 & DP21-0296. Also the case number for the JTED Expansion is not correct, Sub Area “B-IV”. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.H.5 – Show the required 1’ setback from the proposed building to the drive-through lane, UDC Article 7.4.6.F.2.a.(2). Also demonstrate on the plan that the requirement of UDC Article 7.4.6.E.2 are met. 4. COMMENT: 2-06.4.9.H.5.a – Clearly demonstrate how the requirements of 7.4.11 are met. 5. COMMENT: Provide a copy of the required Design Review approval letter with your next submittal, see PAD-15 Section C.6. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
01/17/2023 | CDRC Application Completeness | REVIEW COMPLETED | |||
01/31/2023 | CDRC Review Coordinator | REVIEW COMPLETED | |||
02/03/2023 | Fire New Construction | REVIEW COMPLETED | |||
01/19/2023 | OK to Submit - Engineering | REVIEW COMPLETED | |||
01/20/2023 | OK to Submit - Landscape | REVIEW COMPLETED | |||
01/24/2023 | OK to Submit - Zoning | REVIEW COMPLETED | |||
02/08/2023 | ROW Engineering Review | REVIEW COMPLETED | No Comments |