Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.2
Permit Number - TD-DEV-0123-00098
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/30/2023 | Site Landscape | APPROVED | |||
09/21/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
08/29/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Comment 4 was not addressed: Clarify roof drainage on new building and ensure scuppers are shown on the site plan to ensure drainage up to the 10-yr storm is not directed over the sidewalk 2. Show how the culvert HW of 65.72 ft will not cause flooding over 2 ft in the parking lot Scott Haseman scott.haseman@tucsonaz.gov |
||
09/21/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Koch Parcel Development Package (2nd Review) TD-DEV-0123-00098 TRANSMITTAL DATE: September 21, 2023 DUE DATE: September 21, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 07, 2024. CONTENT REQUIREMENTS 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 1. This comment was not fully addressed. Clearly demonstrate that the requirements of UDC Article 5.3.6.B are met. COMMENT: 2-06.4.7.A.6.a – Clearly demonstrate that all applicable requirements of UDC Article 5.3 are met to include but not limited to, structure height, siting and view corridors, etc. 2-06.4.7.A.8 - For development package documents provide: 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Zoning acknowledges that final plat TD-DIV-0123-00031 has been approved and recorded, provide the case number adjacent to the title block on all sheets of the DP. COMMENT: 2-06.4.9.E – Development Package note 2 talks about a lot line reconfiguration. This reconfiguration will need to be approved and recorded prior to approval of this DP. 3. This comment was not addressed and the plan still show 27 spaces provided. COMMENT: 2-06.4.9.H.5.a – Based on the number of provided vehicle parking spaces, 27, the required number of accessible vehicle parking spaces is not correct. Review 201 IBC, Table 1106.1 and provide the correct number of accessible spaces. Also with the calculation provide the number of required & provided van accessible parking spaces. 4. This comment was not addressed. COMMENT: 2-06.4.9.H.5.d – Show the location of the proposed long-term bicycle parking on the plan and provide a detail that addresses the requirements of UDC Article 7.4.9. 5. This comment was not addressed. No CC&R;s were provided with this submittal. COMMENT: 2-06.4.9.L – As you are proposing vehicle access across the parcel to the east some type of easement/agreement is required. Provide a copy of the recorded documents with the next submittal. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
08/22/2023 | CDRC Application Completeness | REVIEW COMPLETED | Error creating a BB session. I have created an IT ticket to get it hopefully resolved. | ||
08/28/2023 | Fire New Construction | REVIEW COMPLETED |