Permit Review Detail
Review Status: Requires Resubmit
Review Details: PRIVATE UTILITY v.1
Permit Number - TC-UTL-1222-00025
Review Name: PRIVATE UTILITY v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/11/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/11/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide sufficient information to build the private sewer collection system (e.g. pipe size, pipe material, rim and inverts of each cleanout, distance between each cleanout, pipe slopes, etc.).Reference: Section 107.2.1, IBC 2018. 2. The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout. The drawing shows one section of the private sewer that has a developed length of approximately 104 feet. Reference: Section 708.1.1, IPC 2018. 3. Provide sufficient information to build the water service system (e.g. pipe sizes, pipe material, any proposed sub-meters, connections to the buildings, etc. ).Reference: Section 107.2.1, IBC 2018. 4. The drawing shows a single existing water meter to serve both buildings. Provide the size of the water meter, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. 5. Provide a full-open valve for the water supply entrance to each dwelling unit unless each fixture is equipped with stop valves. Reference: Section 606.1(6), IPC 2018. |
||
| 12/08/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |