Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: PRIVATE UTILITY v.1
Permit Number - TC-UTL-1222-00018
Review Name: PRIVATE UTILITY v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/22/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
02/22/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. An approved two-way cleanout fitting is a listed single fitting, not field-assembled as shown on sheet 43 of 101. Reference: Sections 707.1 (3), 708.1.3, and 708.1.8, IPC 2018. 2. The installation of a private sewer collection system that includes manholes requires approval of the system design by the Pima County Department of Environmental Quality as well as a building permit from the City of Tucson. Submit the private sewer collection system drawings that have been approved by the Pima County Department of Environmental Quality for subsequent approval by the City of Tucson PDSD. Reference Title 18, R18-9-E302, 4.02 General Permit, Arizona Administrative Code. |
||
01/27/2023 | PDSD Application Completeness | REVIEW COMPLETED |