Permit Number: TC-UTL-1124-00099
Parcel: 13339283A

Review Status: Requires Resubmit

Review Details: UTILITIES REVIEW v.2

Permit Number - TC-UTL-1124-00099
Review Name: UTILITIES REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/20/2024 Commercial Building APPROVED
12/05/2024 Commercial Electrical APPROVED
12/18/2024 Site Engineering NOT REQUIRED
01/07/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/07/2025 Entitlements REQUIRES RESUBMIT See zoning comments - this application has been submitted for the incorrect parcel and address. Address information must be corrected on permit and plans prior to Entitlements confirming any special exception requirements.
12/23/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Fernando García
Planning & Development Services Department – Zoning Review Section

PROJECT:
TC-UTL-1124-00099 – Utility Tower Upgrade
9601 E Salvatore Pl, Tucson, AZ 85748
Building Plan Review (1st Review)

TRANSMITTAL DATE: December 23, 2024

This site is located in the R-3 zone (UDC 4.7.12). Per UDC Table 4.8-2, distribution system is a permitted use in this zone subject to 4.9.11.A.1, .2, .5, .8, .9, .11, .12 and Zoning Examiner Special Exception.

1. (Comment) The address provided for this site (231 S Harrison Rd, Tucson, AZ 85748) is incorrect. The correct address for this property is 9601 E Salvatore Pl, Tucson, AZ 85748. The correct parcel number is 133-39-283A.

2. Provide an overall site plan or draw, dimension and label site boundaries on the detailed site plan.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected plans, with a comment response letter that indicates the response to each comment.

If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov.
11/19/2024 Fire New Construction REVIEW COMPLETED
11/18/2024 IT Infrastructure Engineering REVIEW COMPLETED
11/18/2024 PDSD Application Completeness Express REVIEW COMPLETED