Permit Number: TC-UTL-1024-00091
Parcel: 140400620

Review Status: Requires Resubmit

Review Details: PRIVATE UTILITY REVISION v.1

Permit Number - TC-UTL-1024-00091
Review Name: PRIVATE UTILITY REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/20/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/20/2025 Commercial Plumbing - Standard REQUIRES RESUBMIT 1. Verify the size of the existing water meter; Tucson Water records list a 5/8” water meter for this address.
2. Provide the site plan referenced on the plumbing plan. Reference: Section 107.2.1, IBC.
3. If no new work is being done in the building, how was the restroom previously supplied with water? To where were the fixtures draining? Reference: Section 107.2.1, IBC.
04/22/2025 Outdoor Lighting - Standard REQUIRES RESUBMIT Commercial Electrical Review TC-UTL-1024-00091 (7140 S FRANCES AV TUCSON, AZ 85756)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Please provide a Revision Narrative letter with your submittal. The provided electrical page is the same one that is already approved it appears.
2. A signature and date are required as part of the Registrant Seal (Electrical). Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that in addition to signing the seal, the registrant shall include the date the document was sealed.

3. Please resubmit with EOR Seal corrected to include the date signed.
04/21/2025 PDSD Application Completeness Express REVIEW COMPLETED