Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: PRIVATE UTILITY REVISION v.1
Permit Number - TC-UTL-1024-00091
Review Name: PRIVATE UTILITY REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/20/2025 | Commercial Plumbing - Standard | REQUIRES RESUBMIT | 1. Verify the size of the existing water meter; Tucson Water records list a 5/8” water meter for this address. 2. Provide the site plan referenced on the plumbing plan. Reference: Section 107.2.1, IBC. 3. If no new work is being done in the building, how was the restroom previously supplied with water? To where were the fixtures draining? Reference: Section 107.2.1, IBC. |
||
| 04/22/2025 | Outdoor Lighting - Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-UTL-1024-00091 (7140 S FRANCES AV TUCSON, AZ 85756) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Please provide a Revision Narrative letter with your submittal. The provided electrical page is the same one that is already approved it appears. 2. A signature and date are required as part of the Registrant Seal (Electrical). Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that in addition to signing the seal, the registrant shall include the date the document was sealed. 3. Please resubmit with EOR Seal corrected to include the date signed. |
||
| 04/21/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |