Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-UTL-0825-00074
Parcel: 11307118C

Review Status: Requires Resubmit

Review Details: PRIVATE UTILITY v.1

Permit Number - TC-UTL-0825-00074
Review Name: PRIVATE UTILITY v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/25/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/25/2025 Commercial Electrical - Standard REQUIRES RESUBMIT Commercial Electrical Review TC-UTL-0825-00074 (3105 N CAMPBELL AV TUCSON, AZ 85719)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Provide an updated utility site map showing the estimated locations of all electrical equipment, including but not limited to, transformers, pedestals, and electrical service entrances to all buildings.
2. Show the estimated location of all electrical lines, underground and overhead, and conduits to all equipment, including the connection to the service entrances of each building.
3. Update DP utility sheets to match provided sheets for this utility permit.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
09/25/2025 Commercial Plumbing - Standard REQUIRES RESUBMIT The maximum distance between cleanouts in the building sewer shall be 100 feet, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.1, IPC 2018.
08/29/2025 PDSD Application Completeness Express REVIEW COMPLETED
09/08/2025 Site Engineering - Standard REVIEW COMPLETED