Permit Review Detail
Review Status: Requires Resubmit
Review Details: UTILITIES REVIEW v.2
Permit Number - TC-UTL-0824-00068
Review Name: UTILITIES REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/21/2024 | Commercial Building | APPROVED | |||
| 09/23/2024 | Fire New Construction | NOT REQUIRED | |||
| 10/23/2024 | Site Engineering | NOT REQUIRED | |||
| 10/24/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/23/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical review comments and provide a written response. 1 Provide a complete electrical Line Diagram, include all the following; -Show all OCPD’s ratings, including the generator. -AIC ratings for all equipment. -Provide specifications for the generator. -The panel schedule for the Main 200-amp panel shows a load calculation of 7.7 amps and the panel schedule for the downstream 100-amp TELCO panel shows a larger load of 15.4 amps with a total load 30.8 amps. Please clarify how the Main panel has a load less than the downstream panel and how total load equals 30.8 amps. 2 For clarification, indicate what equipment is new and what equipment is existing to remain. Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
| 10/24/2024 | IT Infrastructure Engineering | REQUIRES RESUBMIT | To be reviewed on next submittal, please see Electrical comments. -Gabriel Sleighter | ||
| 10/24/2024 | Site Zoning | REQUIRES RESUBMIT | To be reviewed on next submittal, please see Electrical comments. -Gabriel Sleighter | ||
| 10/04/2024 | Entitlements | REVIEW COMPLETED | No special exception required | ||
| 09/23/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |