Permit Number: TC-UTL-0625-00049
Parcel: 12512079C

Review Status: Requires Resubmit

Review Details: PRIVATE UTILITY v.1

Permit Number - TC-UTL-0625-00049
Review Name: PRIVATE UTILITY v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/01/2025 Commercial Electrical - Standard APPROVED
07/21/2025 Site Engineering - Standard NOT REQUIRED
07/21/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/14/2025 Commercial Plumbing - Standard REQUIRES RESUBMIT 1. The maximum distance between cleanouts shall be 100 feet, measured along the developed pipe length from the upstream entrance of the cleanout (see keynote #4, C2.0). Reference: Section 708.1.1, IPC 2018.
2. The service lateral of the building sewer should be horizontally perpendicular to the public sewer line unless approved by Pima County RWRD. Reference: Section 5.3.1, RWRD Design Standards 2022.
3. A 6” service lateral cannot connect directly to the public sewer; it must connect to a manhole. Reference: Section 5.3.2, RWRD Design Standards 2022.
4. Provide the rim elevation of the next upstream sanitary manhole (9810-113, or the new manhole, if one is being installed) and the first-floor elevation. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
06/13/2025 PDSD Application Completeness Express REVIEW COMPLETED