Permit Review Detail
Review Status: Requires Resubmit
Review Details: UTILITIES REVIEW v.1
Permit Number - TC-UTL-0624-00027
Review Name: UTILITIES REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/26/2024 | Commercial Building | APPROVED | |||
07/17/2024 | Site Zoning | APPROVED | |||
07/24/2024 | Site Engineering | NOT REQUIRED | |||
07/26/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
07/17/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Ref; plan sheet E-1. The panel ratings shown in the panel schedule do not correlate with the panel shown on the line diagram. The panel details in the panel schedule call for a 1 phase panel 42K and the line diagram shows 3 phase 22K rated. Please revise and re-submit. Ref; 2018 IBC section107.2.1, 2017 NEC 408.4. |
||
07/17/2024 | Entitlements | REVIEW COMPLETED | No substantial change to height or visual mass, no special exception required. -GS | ||
06/20/2024 | Fire New Construction | REVIEW COMPLETED | |||
06/25/2024 | IT Infrastructure Engineering | REVIEW COMPLETED | |||
06/20/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |