Permit Review Detail
Review Status: Requires Resubmit
Review Details: PRIVATE UTILITY v.2
Permit Number - TC-UTL-0525-00045
Review Name: PRIVATE UTILITY v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/15/2025 | Commercial Electrical - Standard | APPROVED | |||
| 08/11/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/11/2025 | Commercial Plumbing - Standard | REQUIRES RESUBMIT | Verify the developed length between each of the cleanouts. Keynote 13 on sheet C4, for example, states that the horizontal distance between cleanouts is 194.1 feet (keynote 11 on sheet C5 gives the same horizontal distance). [Initial comment: The maximum distance between cleanouts in the building sewer shall be 100 feet, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.1, IPC 2018. | ||
| 07/11/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |