Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: PRIVATE UTILITY v.1
Permit Number - TC-UTL-0525-00037
Review Name: PRIVATE UTILITY v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/03/2025 | Outdoor Lighting - Standard | NOT REQUIRED | |||
| 06/16/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/04/2025 | Commercial Electrical - Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-UTL-0525-00037 (5462 E GLENN ST TUCSON, AZ 85712) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide an updated utility site map showing the estimated locations of all electrical equipment, including but not limited to, transformers, pedestals, and electrical service entrances to all buildings. 2. Show the estimated location of all electrical lines, underground and overhead, and conduits to all equipment, including the connection to the service entrances of each building. 3. Update DP utility sheets to match provided sheets for this utility permit. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 06/16/2025 | Commercial Plumbing - Standard | REQUIRES RESUBMIT | Provide an updated utility site plan showing: a. the size, route, and material of the water service to the building b. the size and location of the water meter and the associated backflow preventer c. the size, route, material, slope, and location of all cleanouts for the building sewer d. the point of connection to the public sewer e. The size, route, and material of the storm drain. |
||
| 05/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |