Permit Number: TC-UTL-0524-00020
Parcel: 12702266B

Review Status: Requires Resubmit

Review Details: UTILITIES REVIEW v.2

Permit Number - TC-UTL-0524-00020
Review Name: UTILITIES REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/25/2024 Commercial Building APPROVED
06/27/2024 Commercial Electrical APPROVED
06/28/2024 Site Engineering NOT REQUIRED
06/28/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/31/2024 Entitlements REQUIRES RESUBMIT New antennas extend more than 36 inches from the point of attachment to the tower, presenting a substantial change in the visual mass of the array. The tower is less than 80 feet in height, and more than two times the height of the structure from residential or office zoning.

A Zoning Examiner Special Exception procedure is required. Your next step will be requesting a pre-application meeting with staff, and then holding a required neighborhood meeting.
06/20/2024 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-UTL-0524-00020
5336 E SPEEDWAY BL. - C-2
Adding additional antennas (1st Review)

TRANSMITTAL DATE: ‎June 20, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the C-2 zone (UDC 4.7.21). Wireless Communication, limited to communication towers and antennas is a permitted use in the zone (UDC Table 4.8-4) and is subject to Zoning Examiner Special Exception Procedure, Section 3.4.3 and Use Specific Standards 4.9.4.I.2, .3, & 7.b

1. COMMENT: Zoning has reviewed the plans but until the Zoning Examiner Special Exception Procedure is complete Zoning cannot approve this plan, see Entitlements comments.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
05/30/2024 Fire New Construction REVIEW COMPLETED
06/03/2024 IT Infrastructure Engineering REVIEW COMPLETED
05/29/2024 PDSD Application Completeness Express REVIEW COMPLETED