Permit Review Detail
Review Status: Requires Resubmit
Review Details: UTILITIES REVIEW v.1
Permit Number - TC-UTL-0425-00027
Review Name: UTILITIES REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/19/2025 | Commercial Building - Standard | APPROVED | |||
| 05/23/2025 | Entitlements - Standard | APPROVED | |||
| 04/23/2025 | IT Infrastructure Engineering - Standard | APPROVED | |||
| 05/23/2025 | Site Zoning - Standard | APPROVED | |||
| 05/13/2025 | Fire New Construction - Standard | NOT REQUIRED | |||
| 05/08/2025 | Outdoor Lighting - Standard | NOT REQUIRED | |||
| 05/28/2025 | Site Engineering - Standard | NOT REQUIRED | |||
| 05/28/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/08/2025 | Commercial Electrical - Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-UTL-0425-00027 (424 W SPEEDWAY BL TUCSON, AZ 85705) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. A signature and date are required as part of the Registrant Seal (Electrical). Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that in addition to signing the seal, the registrant shall include the date the document was sealed. 2. Please resubmit with EOR Seal corrected to include the date signed. |
||
| 04/22/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |