Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: UTILITIES REVIEW v.1
Permit Number - TC-UTL-0324-00011
Review Name: UTILITIES REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/03/2024 | Site Engineering | NOT REQUIRED | |||
04/22/2024 | Site Zoning | NOT REQUIRED | Entitlements review not required for the proposed scope of work. | ||
05/06/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/06/2024 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Provide structural design and calculations prepared by Arizona Licensed design professional to indicate the existing structure is adequate to receive the additional equipment. Please include mounting and connection details. IBC 107.2.1 Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
05/02/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1. “This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans showing the designated branch circuits, panel, outlet devices, complete panel schedule for all power requirements for this equipment, sealed by a Registrant registered in the State of Arizona. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304". City of Tucson Commercial Plan/Permit Submittal Requirements, 2018 IBC section 107.2.1, 2017 NEC. |
||
04/22/2024 | Entitlements | REVIEW COMPLETED | Scope of work includes home-level wifi equipment, no entitlements review is required for this application. Defer to Engineering, Building, and Electrical review please. | ||
04/04/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/11/2024 | IT Infrastructure Engineering | REVIEW COMPLETED | |||
04/03/2024 | PDSD Application Completeness | REVIEW COMPLETED |