Permit Number: TC-SOL-0824-00400
Parcel: 117190390

Address:
435 S OTERO AV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SOLAR v.1

Permit Number - TC-SOL-0824-00400
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/20/2024 Site Engineering NOT REQUIRED
09/20/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/17/2024 Historic REQUIRES RESUBMIT The Special District minor review application submittal is complete. Please submit all the same materials under the Historic sub-record. Once you log into TDC Online, go to the My Work tab, and then go to Plans (not Permits). Under Plans there should be the Historic sub-record which I have opened under the TC permit number [TC-SOL-0824-00400], and this is where the same materials are submitted. Given that the application is for solar, it will be a Minor review. On page 2 of this document under Minor review in the table are all the items that you will need for the historic minor review. On page 2 of this document under Minor review in the table are all the items that you will need for the historic minor review. Once submitted the system will generate an SD #. Staff will then contact you about the next steps including invoicing and payment of review fee. Once fee are paid, a minor review will be scheduled.
Here is a link on how to get to the sub-record.
https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf
I am also attaching a flow chart that should help you understand the process.
If you have any questions, contact Michael.Taku@tucsonaz.gov
08/19/2024 PDSD Application Completeness Express REVIEW COMPLETED Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.