Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL ADD/ALT v.1
Permit Number - TC-RES-1225-06215
Review Name: RESIDENTIAL ADD/ALT v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2026 | Residential Engineering | NOT REQUIRED | |||
| 02/02/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/06/2026 | Addressing Validation | REQUIRES RESUBMIT | Please include full property address on construction/site plans and resubmit after all other reviews are complete. You will not be able to submit while reviews are in progress. For questions: PDSD-Residential@tucsonaz.gov |
||
| 02/02/2026 | Residential Building - Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-RES-1225-06215 ADDRESS/PARCEL: (5026 S MOUNTAIN AV TUCSON, AZ 85706) Submit your revised reports along with a response letter which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. Should you have any questions about these comments, I can be reached at ian.gillaspie@tucsonaz.gov. COMMENTS: 1. Please include a complete set of drawings detailing the work that will be done. Include what portions are existing, and what is new. The following link can be used as reference for what is required. Any electrical work will require outlets and wiring to be shown (R106): https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/porch_sample.pdf 2. Please note the City is now using the 2024 IRC. 3. Please resubmit. |
||
| 01/12/2026 | Residential Zoning | REQUIRES RESUBMIT | FROM: Georgia Pennington, Lead Planner DATE: 1/12/26 COMMENTS: This site is located in the R-2 zone (UDC 4.7.9). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10. 1. Provide a site plan that meets the requirements show in the plot plan example at the following link (below) and add height dimensions on an elevation sheet. https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Plan-Examples/Plot-Plan-Example If you have questions, please contact me at georgia.pennington@tucsonaz.gov |
||
| 01/06/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |