Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-RES-1225-06182
Parcel: 126120500

Address:
421 N DESERT SV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL ADD/ALT SIMPLE REVIEW REVISION v.1

Permit Number - TC-RES-1225-06182
Review Name: RESIDENTIAL ADD/ALT SIMPLE REVIEW REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/03/2026 Light Residential Building Review (OIP) - Standard APPROVED
08/10/2026 Residential Zoning APPROVED
09/03/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/19/2026 Residential Engineering REQUIRES RESUBMIT Permit Activity Number: TC-RES-1225-06182 (1st Review)
Project: REV. 1 (8/7/2026) Proposed carport and rear patio addition
Location: 421 N DESERT SV
Review Date: 8/19/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Reviewer Contact: Marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering.
To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files.
Site Engineering Review Comments:
1. Site Engineering will not be able to approve this revision to residential building permit TC-RES-1225-06182 until an updated (Revised) cost estimate is submitted and approved through existing flood plain use permit TE-FPU-0326-00110. Prior to resubmission, ensure that the FPU permit is placed back into approved/issued status.
08/07/2026 PDSD Application Completeness Express REVIEW COMPLETED