Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-RES-1225-05983
Parcel: 117040290

Address:
628 N 3RD AV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SOLAR v.3

Permit Number - TC-RES-1225-05983
Review Name: RESIDENTIAL SOLAR v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/07/2026 Light Residential Building Review (OIP) - Standard APPROVED All construction shall comply with the 2018 International Building Codes, the 2017 NEC, and TEP 2025 ESRB requirements.



All construction permitted after Jan. 1 2026 shall comply with the 2024 International Building Codes, the 2023 NEC, and 2025 TEP 2025 ESRB requirements including all City of Tucson adopted amendments. See this link for more information. https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Building-Codes
01/12/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/12/2026 Residential Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Jeffrey W. Cassidy, Planner
Planning & Development Services Department – Current Zoning Review Section

PROJECT: TC-RES-1225-05983 – Residential Building – Roof mount 2.6 kW DC addition to existing photovoltaic solar system
628 N 3RD AV TUCSON, AZ 85705 (HR-2 Zoning)
Solar Review –3rd Review

TRANSMITTAL DATE: January 12, 2026

This site is in the R-2 Residence Zone (UDC 4.7.9). A single-family residence is permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10.

Plan review for the above referenced roof top mounted solar has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

1. COMMENT: Zoning acknowledges permit SD-1225-00191 has been approved but the PDSD Director's Decision Letter has yet to be resubmitted as part of this permit.

Please upload the Director's Decision Letter here once received. Zoning cannot approve this permit until this task has been completed.

For questions about the Special Districts application or the Director's Decision Letter, reach out to the Historic Review Section to Michael Taku at michael.taku@tucsonaz.gov

2. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other the PDSD reviewer comments.

SUBMITTAL AND RESUBMITTAL OF THE FOLLOWING IS REQUIRED:

1. Building (solar) permit

2. Director's Decision Letter.

3. Documentation requested by Historic Reviewer (most recent development package/design package materials).

To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home

Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf
01/07/2026 Historic REVIEW COMPLETED The historic approval decision letter (DL) for plan # SD-1225-00191 has been signed by the Planning & Development Services Director. Your sub-application is complete. Please upload the DL to your primary permit # TC-RES-1225-05983, along with your most recent development package/design package materials. You will be instructed further if permit issuance is contingent on meeting any additional requirements.
Contact Michael.Taku@tucsonaz.gov
01/06/2026 PDSD Application Completeness Express REVIEW COMPLETED