Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-RES-1224-07059
Parcel: 11205090B

Address:
3021 N WILSON AV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SOLAR v.1

Permit Number - TC-RES-1224-07059
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/07/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/20/2024 Light Residential Building Review (OIP) REQUIRES RESUBMIT Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC).
1. AC Overcurrent Protective Device and Conductor Sizing for PV source Circuits and Module Interconnection Conductors (Imax x 1.25) Reference NEC 690.8(A)(3) and (B)(1). Show a complete calculation for determining OCPD and conductor requirements, per 706.21 for ESS. See also 706.
2. how ESS system in the back feed breaker sizing table or similar and show compliance with interconnection at the main service entrance per 705.12
3. Provide Main Service Panel (MSP) taps in compliance with NEC 705.12; Include ESS system in the backfeed breaker and conductor sizing calculations.
01/07/2025 Site Engineering REQUIRES RESUBMIT TC-RES-1224-07059
3021 N WILSON AV

This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home

Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”

NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown and include the cost of materials and labor. It may not be a leasing document.

Chris Arrington
chris.arrington@tucsonaz.gov
12/06/2024 PDSD Application Completeness Express REVIEW COMPLETED