Permit Number: TC-RES-1223-10015
Parcel: 120091300

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.1

Permit Number - TC-RES-1223-10015
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2024 Site Engineering NOT REQUIRED
01/02/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/27/2023 Residential Building REQUIRES RESUBMIT TC-RES-1223-10015
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

GENERAL COMMENTS :

1. All plans submitted for a newly constructed one- or two-family dwelling require compliance with design ordinances for handicap, solar water, photo-voltaic, gray water, and EV charging preparations. Design Ordinances adopted by the City of Tucson.
2. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc.
3. All plans submitted for a newly constructed one- or two-family dwelling after March 1, 2009, require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation.
4. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3.
5. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations

SITE PLAN:

1. Show the location and size of buildings, utility meters and gas, water, electric and sewer or septic lines from property line to building, R106.1.1.

PLANS:

1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1.
2. Provide manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona, or notate the requirement for deferred submittal, R106.1.
3. Provide a complete prescriptive braced wall design, R602.10, or provide an engineer’s sealed plan set for performance compliance consideration, R301.1.3. Identify each wall line needed for enclosing a complete rectangle with sides no greater than 60’, Figure R602.10.1.1. Show interior braced wall panels with foundation anchor bolt connection to bottom plates, R602.10.8.3 and R403.1.6.

SECTIONS - DETAILS:

1. Show exterior wood siding, sheathing and wall framing with a 6” clearance above the ground (R317.1 item 5). Update the 4” floor elevation shown on sheet A-5. The weep screed may extend with a minimum clearance 4” above grade or 2” above paved areas, R703.7.2.1.
2. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38. Update the R-30 which is not showing R-5 ridge insulation at the north section on sheet A-5.
3. Include the R-5 ridge insulation at keynote #2 detail #1 sheet A-6.

PLUMBING PLANS:

1. Update the code reference at note #1 sheet P-1.
2. Tucson Water Department limits flow rates for each water meter size in compliance with P2903.7. Show an appropriate 1” yard pipe and show the water meter size.
3. Show gas pipe sizes in compliance with connected demand, G2413.3 & Table G2413.4(1). Provide a gas line isometric or table for showing the BTU demand and length of line to each gas appliance.

MECHANICAL PLANS:

1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation with controlled exhaust, R303.4; N1103.6 & M1505.4. Show the minimum airflow rate setting and location of the device requiring this adjustable setting. A four-five bedroom dwelling greater than 1500 SF requires a 75 CFM continuous setting.
2. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D.

ELECTRICAL PLANS:

1. Show the location of a carbon monoxide detector outside of bedroom doors, when the dwelling includes an attached garage or gas appliance, R315.

OUTDOOR LIGHTING CODE

1. Show the proposed fixture as full cut-off FCO style or provide an Outdoor Lighting Calculation including all exterior fixtures on the property for determining exterior lighting limits. Security flood lights are unshielded and require the calculation. Show full cutoff fixtures were located within 25 feet from the property line OLC 401.3.3.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review

Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services
12/20/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-RES-1223-10015
426 E MICHIGAN DR. – R-2
New SFR (1st Review)

TRANSMITTAL DATE: December 20, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the R-2 zone (UDC 4.7.9). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10.

1. Provide a lot coverage calculation that meets the requirements found at UDC Article 6.4.3 and the example shown on the Residential Plot Plan Requirements found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example. Lot coverage includes all vehicle use areas, whether improved or unimproved, UDC Article 6.4.3.B.3.b.

2. The back yard setback listed under Project Data note 4 and the setback line shown on the site plan are not correct. Per UDC Table 6.3-2.A the required perimeter yard setback is 6’-0” or 2/3 (H) height of the exterior wall, greater of the two dimensions.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
12/13/2023 PDSD Application Completeness Express REVIEW COMPLETED