Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-RES-1222-01632
Parcel: 11305192A

Address:
3438 N WILSON AV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.2

Permit Number - TC-RES-1222-01632
Review Name: RESIDENTIAL NEW DWELLING v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/11/2023 Residential Building REQUIRES RESUBMIT The 408.7 Sq. Ft. metal building requires construction plans showing 2018 IRC code compliance. Sample plans are at https://www.tucsonaz.gov/pdsd/residential-permits.
A manufactured building requires the supplier set of engineered sealed plans showing the assembly requirements for local wind loads.
05/11/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Nathan Herrera
Planner

PROJECT: TC-RES-1222-01632
Address: 3438 N Wilson Ave, Tucson AZ. 85719
Parcel: 113-05-1920
Zoning: RX-2
Existing Use: Single Family Residence
Project Description: Fence and storage building (3rd Review)

TRANSMITTAL DATE: 5/11/2023

This site is located in the RX-2 zone (UDC 4.7.7). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-1).

1. COMMENT: Per UDC Table 6.3-1.A the minimum setback is twenty feet facing each interior property line. The “Residence” shown at “Building on line” will require a Board of Adjustment for Variance. Board of Adjustment application/requirements can be found at: https://www.tucsonaz.gov/files/pdsd/codes/Zoning_Administration_Application_BA_fillable.pdf

Zoning cannot approve until the Board of Adjustment process is complete, and has approved of the proposal.

2. COMMENT: Aerial pictures of the property show the “metal building”, as shown on the site plan, appears to be connected to the main house through a series of porches, and is encroaching into the required twenty feet perimeter yard setback. Per UDC Section 6.6.2.F, “An accessory building may be attached to a principal building, provided that its construction complies with the development requirements of the principal building.”

The Board of Adjustment Variance application needed to address Comment 1 can also include the “metal building” in the application. If the metal building is no longer connected to the main house in this manner state so on the next submittal. The neighbor signatures provided on the site plan will only be acceptable for detached accessory structures that encroach into perimeter yard setbacks, not attached accessory structures.

3. COMMENT: Show the height of the “metal building” on the site plan within the building footprint. Per UDC Section 6.6.3.D, “Accessory structures, shall not exceed 12 feet in height, unless attached to a principal structure. If attached to the principal structure, maximum height permitted shall be the same as for the principal structure.”
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised residential building permit along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf


If you have any questions about this transmittal, please contact Nathan Herrera at Nathan.Herrera@TucsonAZ.gov or 520-837-4894
05/18/2023 Zoning Modifications - Variance REQUIRES RESUBMIT Zoning has identified an item that requires a variance. A Board of Adjustment Variance is processed in accordance with UDC Section 3.10.3. As such, a pre-application meeting and neighborhood meeting is required prior to the submittal of an application. To request a pre-application meeting, please apply for "Pre-Application Conference" at TDC Online under your permit #. If you have questions, you can email me at Georgia.Pennington@tucsonaz.gov
04/13/2023 PDSD Application Completeness Express REVIEW COMPLETED