Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-1222-01232
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/05/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/16/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-RES-1222-01232 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied NEED THE ENGINEER'S STRUCTURAL ANALYSIS REPORT FOR THE ADDITION OF THE EQUIPMENT AND THE EXISTING STRUCTURE. INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2. NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND APPROVAL OF USING THE ECURB MOUNTS FO RTHE RACKING SYSTEM. TWO OF THE FOUR MOUNTING BOLTS MAY NOT BE FASTENED TO THE ROOF FRAMING BUILDING REVIEW COMMENTS: Denied NEED THE ENGINEER'S STRUCTURAL ANALYSIS REPORT FOR THE ADDITION OF THE EQUIPMENT AND THE EXISTING STRUCTURE. INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2. NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND APPROVAL OF USING THE ECURB MOUNTS FO RTHE RACKING SYSTEM. TWO OF THE FOUR MOUNTING BOLTS MAY NOT BE FASTENED TO THE ROOF FRAMING MECHANICAL REVIEW COMMENTS: N/A ELECTRICAL REVIEW COMMENTS DeniedNEED THE ENGINEER'S STRUCTURAL ANALYSIS REPORT FOR THE ADDITION OF THE EQUIPMENT AND THE EXISTING STRUCTURE. INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2. NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND APPROVAL OF USING THE ECURB MOUNTS FO RTHE RACKING SYSTEM. TWO OF THE FOUR MOUNTING BOLTS MAY NOT BE FASTENED TO THE ROOF FRAMING. VERIFY EQUIPMENT IS READILY ACCESSIBLE AS REQUIRED BY UTILITY COMPANY AND EMERGENCY PERSONNEL. SHOW THE EQUIPMENT DISTANCE FROM THE POOL/SPA. VERIFY THE REQUIREMENTS OF NEC SECTION 680 ARE MET AS APPLICABLE. NEED THE PANEL LOAD CALCULATIONS FOR DERATING THE MAIN BREAKER. THE HIGH TEMPERATURE CORRECTION FACTORS FOR 41 DEGREES C ARE .82 AND .87 AS DETAILED IN TABLE 690.31(A) PLUMBING REVIEW COMMENTS: N/A If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 01/05/2023 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit: TC-RES-1222-01232 Address: 2801 W Saint Tropaz Av After comparing the aerials to the plot plan, it has come to my attention that there is a possible non-permitted addition on the Soutwest portion of the house. Upon reviewing permit history on PRO (https://pro.tucsonaz.gov/), I was not able to verify a permit for this addition. Please relocate your solar panels to a permitted portion of the house or obtain permits for your rear addition which appeared around 2005. If you have questions, please contact robert.parsons@tucsonaz.gov |
||
| 12/08/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |