Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-1222-01225
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/05/2023 | Light Residential Building Review (OIP) | APPROVED | |||
01/05/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
12/15/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-RES-1222-01225 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DENIED NEED THE ENGINEER'S STRUCTURAL ANALYSIS REPORT FOR THE ADDITION OF THE EQUIPMENT AND THE EXISTING STRUCTURE. INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2. NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND THE APPROVAL OF USING THE E-CURB MOUNTS TO SUPPORT THE RACKING. ONLY TWO OF THE FOUR MOUNTING BLTS WILL LIKELY ATTACH TO THE FRAMING. NEED THE TILE HOOK INSTRUCTIONS SHOWING THE SPACING REQUIREMENTS BUILDING REVIEW COMMENTS: DENIED NEED THE ENGINEER'S STRUCTURAL ANALYSIS REPORT FOR THE ADDITION OF THE EQUIPMENT AND THE EXISTING STRUCTURE. INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2. NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND THE APPROVAL OF USING THE E-CURB MOUNTS TO SUPPORT THE RACKING. ONLY TWO OF THE FOUR MOUNTING BLTS WILL LIKELY ATTACH TO THE FRAMING. NEED THE TILE HOOK INSTRUCTIONS SHOWING THE SPACING REQUIREMENTS. VERIFY EQUIPMENT IS READILY ACCESSIBLE AS REQUIRED BY UTILITY COMPANY AND EMERGENCY PERSONNEL. MECHANICAL REVIEW COMMENTS: N/A ELECTRICAL REVIEW COMMENTS DENIED NEED THE ENGINEER'S STRUCTURAL ANALYSIS REPORT FOR THE ADDITION OF THE EQUIPMENT AND THE EXISTING STRUCTURE. INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2. NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND THE APPROVAL OF USING THE E-CURB MOUNTS TO SUPPORT THE RACKING. ONLY TWO OF THE FOUR MOUNTING BLTS WILL LIKELY ATTACH TO THE FRAMING. NEED THE TILE HOOK INSTRUCTIONS SHOWING THE SPACING REQUIREMENTS. THE NEUTRAL AND GROUND ARE NOT SHOWN BONDED IN THE ELECTRICAL DIAGRAM OF THE MAIN DISCONNECT PANEL. VERIFY EQUIPMENT IS READILY ACCESSIBLE AS REQUIRED BY UTILITY COMPANY AND EMERGENCY PERSONNEL. PLUMBING REVIEW COMMENTS: N/A If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
12/07/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |