Permit Number: TC-RES-1124-06693
Parcel: 133520300

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1

Permit Number - TC-RES-1124-06693
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/11/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/11/2025 Other Inspection Reports (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-RES-1124-06693
ADDRESS/PARCEL: (76 N SOUTHERN SWALE AV TUCSON, AZ 85748)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter.

1. The Repair Plan shows 4 helical piers installed with a min depth of 8ft. The final letter and report only mentions 3 helical piers at a depth of 5ft. Please provide a letter from the structural engineer approving those design changes.
2. Please resubmit
04/11/2025 Special Inspection Certificate Review (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-RES-1124-06693
ADDRESS/PARCEL: (76 N SOUTHERN SWALE AV TUCSON, AZ 85748)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter.

1. The Repair Plan shows 4 helical piers installed with a min depth of 8ft. The final letter and report only mentions 3 helical piers at a depth of 5ft. Please provide a letter from the structural engineer approving those design changes.
2. Please resubmit
04/04/2025 PDSD Application Completeness Express REVIEW COMPLETED