Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-1123-09246
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/20/2023 | Site Engineering | NOT REQUIRED | |||
| 11/20/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/16/2023 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review TC-RES-1123-09246 (7163 S SUSANA DR TUCSON, AZ 85756) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC). 1. After a review of aerial views (https://maps2.tucsonaz.gov/Html5Viewer/?viewer=maptucson#) of the property, it appears that PV modules are mounted on an unpermitted addition to the structure on the north east side of the building. Searching city records through PRO (https://pro.tucsonaz.gov/address_search/) found no permit history for this addition appearing around 2006. Either provide completed permit and inspection documentation, apply for and complete permit review and inspections for the structure or remove the PV modules from the unpermitted addition. 2. It also appears that the addition has possibly enclosed the MSP? 3. Show the mast height on the electrical riser diagram, NEC 230.24. Providing 8’ clearance above the roof, Or relocate the service entrance to a code compliant location, 2017 NEC 230.24(A). 4. Show that the panel has clear working space compliance, 2017 NEC 110.26(A) Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 11/03/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |