Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-RES-1122-01115
Parcel: 141420020

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SOLAR v.1

Permit Number - TC-RES-1122-01115
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/30/2022 Light Residential Building Review (OIP) APPROVED
12/30/2022 Bldg Permits - Post Review PENDING ASSIGNMENT
12/15/2022 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-RES-1122-01115

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
THE STRUCTURAL ANALYSIS IS TO INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2.
THE DESIGN WIND LOAD IS TO BE 115MPH.
NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND THE GROUNDING/BONDING DETAILS AND DIAGRAM.
NEED THE TILE HOOK INSTALLATION INSTRUCTIONS INCLUDING THE SPACING AND FLASHING REQUIREMENTS.
ALL PENETRATIONS IN THE WALL AND ROOF LESS THAN 3FT TO THE PROPERTY LINE ARE TO MEET THE REQUIREMENTS OF SECTION R302.4

BUILDING REVIEW COMMENTS:
Denied
THE STRUCTURAL ANALYSIS IS TO INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2.
THE DESIGN WIND LOAD IS TO BE 115MPH.
NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND THE GROUNDING/BONDING DETAILS AND DIAGRAM.
NEED THE TILE HOOK INSTALLATION INSTRUCTIONS INCLUDING THE SPACING AND FLASHING REQUIREMENTS.
NEED A DOCUMENT SHOWING THE MODULE COMPATIBILITY FROM THE RACKING MANUFACTURER.
VERIFY EQUIPMENT IS READILY ACCESSIBLE AS REQUIRED BY UTILITY COMPANY AND EMERGENCY PERSONNEL.
DETAIL HOW THE SAFE WORKSPACE AND LEGAL ACCESS OF THE EQUIPMENT BEING INSTALLED ON THE PROPERTY LINE IS AND WILL BE MAINTAINED.
ALL PENETRATIONS IN THE WALL AND ROOF LESS THAN 3FT TO THE PROPERTY LINE ARE TO MEET THE REQUIREMENTS OF SECTION R302.4


MECHANICAL REVIEW COMMENTS:
N/A


ELECTRICAL REVIEW COMMENTS9
Denied
THE STRUCTURAL ANALYSIS IS TO INCLUDE THE DEAD AND LIVE LOADS FOR PORTIONS OF THE ROOF COVERED BY PV PANELS DETAILED IN SECTION R324.4.1.1 CASES 1 AND 2.
THE DESIGN WIND LOAD IS TO BE 115MPH.
NEED THE RACKING INSTALLATION INSTRUCTIONS INCLUDING THE SPANS AND THE GROUNDING/BONDING DETAILS AND DIAGRAM.
NEED THE TILE HOOK INSTALLATION INSTRUCTIONS INCLUDING THE SPACING AND FLASHING REQUIREMENTS.
NEED A DOCUMENT SHOWING THE MODULE COMPATIBILITY FROM THE RACKING MANUFACTURER.
VERIFY EQUIPMENT IS READILY ACCESSIBLE AS REQUIRED BY UTILITY COMPANY AND EMERGENCY PERSONNEL.
DETAIL HOW THE SAFE WORKSPACE AND LEGAL ACCESS OF THE EQUIPMENT BEING INSTALLED ON THE PROPERTY LINE IS AND WILL BE MAINTAINED.
ALL PENETRATIONS IN THE WALL AND ROOF LESS THAN 3FT TO THE PROPERTY LINE ARE TO MEET THE REQUIREMENTS OF SECTION R302.4


PLUMBING REVIEW COMMENTS:
N/A


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
12/01/2022 PDSD Application Completeness REVIEW COMPLETED