Permit Number: TC-RES-1026-05566
Parcel: 11805079A

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.1

Permit Number - TC-RES-1026-05566
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/14/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/12/2026 Residential Building REQUIRES RESUBMIT TC-RES-1026-05566
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review includes architectural, plumbing, mechanical, energy conservation and electrical compliance with the 2024 International Residential Code and 2024 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

GENERAL REQUIREMENTS:

The City of Tucson adopted the 2024 IRC with amendments and building ordinances for all dwellings.

Provide a separate response letter addressing each comment with location of change on the plans.

GENERAL COMMENTS:
https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Building-Codes

1. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021 and 2024 IRC appendix NE. Include a 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space.

PLANS:

1. Remove all outdated code references, R106.1.1. Incorrect entries were found on sheets P-1 & M-1.
2. Provide a minimum 6 mil polyethylene vapor retarder with joints lapped not less than 6 inches between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist, R506.3.3.
3. Show braced wall panel compliance for (narrow) framed walls with a garage door opening, Table R602.10.5. For prescriptive braced wall structures show a portal frame with hold-downs PFH method, Figure R602.10.6.2, or a portal frame at garage door PFG method, Figure R602.10.6.3, or a continuously sheathed portal frame CS-PF method, Figure R602.10.6.4.

MECHANICAL PLANS:

1. Identify the device model number providing an adjustable setting and note the minimum continuous setting for providing whole-house mechanical ventilation, R303.4; N1103.6 & M1505.4.

ELECTRICAL PLANS:

1. Show the Electric Vehicle Supply Equipment 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready” and locate the receptacle at a parking area, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2.
2. Specify the Electric Vehicle NEMA 14-50R receptacle at a parking area, N1104.2.1.
3. Revise the electrical load calculations following Table E3602.2 for sizing the general usage loads. Add the total nameplate for the air conditioning unit.
4. Show a surge-protective device (SPD) as an integral part of or placed immediately adjacent to the service equipment, E3606.5.
5. Remove receptacles from the exterior face of island and peninsular cabinets where below the countertop. Either provide a vertical assembly listed for countertop (work surface) mounting, or a raceway terminated within the cabinet for future assembly installation, E3901.4.2.
6. Provide GFCI protection for appliance receptacle outlets, E3902.12 & 14. Include the Dishwasher, Electric range, Clothes dryer, Microwave oven and HVAC equipment.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place inside near an indoor furnace or utility room, IECC R401.3. Add notation to plans.
2. Specify high-efficacy luminaires with an efficacy not less than 45 lumens per watt or lamps with efficacy not less than 65 lumens per watt (LED devices), IECC R404.1. Remove the 90% limit from note #12.

OUTDOOR LIGHTING CODE

1. Show full cutoff fixtures were located within 25 feet from the property line OLC 401.3.3. Show lamps with a maximum of 3500K color temperature, OLC 402.1.

Please contact the plans reviewer if you have any questions:
Kenneth.VanKarsen@tucsonaz.gov
City of Tucson Residential Building Safety
10/14/2026 Residential Engineering REQUIRES RESUBMIT Permit Activity Number: TC-RES-1026-05566 (1st Review)
Project: SINLE FAMILY RESIDENCE – SFR Residential Grading
Location: 1445 S CAMINO SANTIAGO
Review Date: 10/14/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Reviewer Contact: Marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering.
To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files.
Site Engineering Review Comments:
The property located at 1445 S CAMINO SANTIAGO – APN 11805079A – is entirely impacted by Cholla Wash which carries a W.A.S.H. designation and is entirely within a FEMA AH SFHA. As such the following review will be subject to Chapter 26 FLOODPLAIN, STORMWATER, AND EROSION HAZARD MANAGEMENT* & Chapter 29 Article VIII Watercourse Amenities, Safety, and Habitat Standards and Regulations.
1. A grading plan prepared, signed, and sealed by a licensed Arizona Civil Engineer is required. At minimum, the grading plan shall address the following:
a. Existing topography depicted with 1- or 2-foot contour intervals, including benchmark and datum reference (NAVD 88)
b. Proposed contours and/or spot elevations, including finished grade elevations at all building corners, parking areas, and drainage structures
c. Limits of Disturbance (LOD) delineating the full extent of all proposed grading and drainage-related improvements
d. Earthwork table – Total cut and fill quantities, including total area of disturbance (sq. ft.) and earthwork volumes
e. Engineer of Record Stamp and signature block
2. It will be required that the Top of Bank of the Cholla Wash be delineated on both the Grading plan and site plan sheets accordingly. This will establish “Study Area” requirements in the event encroachment is proposed.
a. W.A.S.H. Ordinance - The Cholla Wash carries a W.A.S.H. (Watercourse Amenities, Safety, and Habitat) designation per Tucson Code Chapter 29, Article VIII. The following items must be addressed:
b. Delineate the Study Area on both the site plan and grading plan. The Study Area consists of the channel, the banks, and the land area extending fifty (50) feet outward from the banks of the wash.
c. Per chapter 26 of the City code, no site improvements can be located within the erosion hazard setback. Includes required parking. Section 26-8. & Section 26-8.b.(5) https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19604. Ensure that Revised plans continue to show all proposed improvements outside the erosion hazard setback from Cholla Wash
3. Revise the site plan to clearly call-out the established erosion hazard setback as demonstrated within the floodplain report provided.
4. Provide drainage flow direction arrows across the entire site to delineate high points, low points, and positive drainage patterns. Flow arrows shall demonstrate that all stormwater runoff is conveyed away from the proposed structure and directed solely toward the applicable adjacent Right-of-Way (ROW) or approved drainage easement. Drainage shall not be directed toward adjacent private parcels. Verify proposed grades reflect a minimum of 5% gradient away from the structure for a minimum horizontal distance of 10 feet [IRC R401.3]
5. The City of Tucson Inclusive Home Design Ordinance requires all new dwellings — including ADUs, single-family residences, and duplexes — to provide an accessible route connecting the public street, sidewalk, or driveway to an accessible entrance of the home. This pathway must be shown, dimensioned, and labeled on the plans. What this means in plain terms: There needs to be a clearly defined, walkable path from where a person arrives (the street, sidewalk, or driveway) all the way to a usable door of the home — one that someone using a wheelchair or mobility aid could navigate without barriers. An exterior accessible route that shall conform to 2017 ICC A117.1 Sections 402 and 403 and City of Tucson Inclusive Home Design Ordinance. The current plans to no reference a material nor show a connection to ROW sidewalk or Parking area proposed. Ensure dimension the path at the minimum 4-feet required.
6. As the subject property is subject to floodplain and erosion hazard conditions – a floodplain use (FPU) permit is required for the work within a floodplain + Required Elevation Certificate for the new SFR. With updates to internal processes – a FPU permit will be administratively processed by Site Engineering on behalf of the applicant
7. For resubmission – it will be required that the floodplain report be revised to include the registrants stamp who prepared it accordingly.
8. Update the Site plan and subsequent grading plan to clearly denote the proposed Finished Floor Elevation (FFE) as determined from the floodplain report.
9. Hydrology/Floodplain Report: Water Surface Elevation Results - The report indicates that the proposed project and the existing off-site improvements should increase the WSE. However, Table [2] shows negative changes (decreased WSEs) at sections 1014.4, 1014, & 1013.9. Provide a discussion in the drainage report explaining why the WSEs decrease (e.g., changes in conveyance, geometry, roughness, or boundary conditions), and confirm the results are consistent with the hydraulic model.
10. Unless a LOMR is pursued & approved, the minimum FFE must be based on the effective FIS water surface elevation, consistent with the elevation certificate for the new SFR. Revise the proposed FFE in the report and document how the minimum FFE was determined.
a. Clearly denote the revised FFE on the resubmitted site plan and all applicable grading plan sheets.
11. TC Sec. 26-5.2: Adverse Impacts – Revise the report to evaluate and discuss whether increased velocities, WSELs, floodprone area, or diverted flows create adverse impacts to adjacent public or private properties. Quantify the changes at adjacent structures. For example, the existing structure to the north may be slab-on-grade, so an increase of 0.1 ft could constitute an increased flood hazard. Where impacts are identified, provide mitigation or demonstrate that no adverse impact results.
12. TC Sec. 29-14(b)1: W.A.S.H. Ordinance - The W.A.S.H. setback may not apply to a proposed single residence because the 1941 plat indicates the lot was created prior to 1991. Document this applicability and the exception criteria, including the plat reference, in the report section addressing W.A.S.H. designation parameters. Regardless of the exception, riparian floodplain disturbance must be minimized per TC Sec. 26-5.2(4). Describe how the design achieves this.
13. TS Sec. 4-04.5.5: Wall Treatment in Hydraulic Models - The existing-conditions model appears to assume wall failure, while the proposed-conditions model treats the same walls as levees. Revise the models so walls are treated consistently in both. For a watercourse with flows of this magnitude, walls are typically either (a) permitted with required wall openings, or (b) assumed to fail during the regulatory flood and therefore ignored in the models. Identify the approach used and justify it. The existing wall at 1461 S Camino Santiago may require a wall opening sizing design to demonstrate compliance.
10/14/2026 Residential Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Erick Bieber
Planning & Development Services Department – Zoning Review Section

PROJECT: TC-RES-1026-05566– Residential Building
1445 S Camino Santiago, Tucson, AZ 85713
New Dwelling Permit (1st Review)

TRANSMITTAL DATE: October 14th, 2026

This site is located in the R-1 zone (UDC 4.7.8). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.5 -.9 & .12

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Correct plans, as noted in the comments below, along with a response letter indicating how all Site Zoning comments were addressed.

1. (Comment) Per UDC 7.6.8, all new residential developments consisting of 1-4 units require basic native, drought resistant landscaping to be added to the site plan.
a. Per UDC 7.6.8.A.1, one canopy tree is required for every 1,000sqft of GFA of the development project. This project will need 3 canopy trees. 50% of required canopy trees must be placed in the front yard.
b. Per UDC 7.6.8.A.2, 5 square feet of vegetative groundcover is required in the front yard for every foot of front yard property line width, minus any curb cut width. Calculate required groundcover using the following equation:
(X Linear feet of Street Frontage) - (Y Curb cut width) x (5 Foot Depth) = Z Square Feet of vegetative groundcover
c. Provide plant species for both the vegetative groundcover and canopy trees to ensure that they are ADWR Low Water Use approved plant species. See the link below to learn more about approved plant species.
d. Existing landscaping may be used to meet landscaping standards but must be indicated and labeled on the site plan.
To learn more about the new residential landscaping code, please visit the following link: https://middle-housing-cotgis.hub.arcgis.com/pages/Residential-Landscaping-Code

To learn more about the new residential landscaping code, please visit the following link: https://middle-housing-cotgis.hub.arcgis.com/pages/Residential-Landscaping-Code

The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code

For questions regarding Zoning comments, please contact me at: Erick.Bieber@tucsonaz.gov
10/09/2026 PDSD Application Completeness Express REVIEW COMPLETED