Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-RES-1025-05099
Parcel: 133381660

Review Status: Requires Resubmit

Review Details: RESIDENTIAL ADD/ALT v.4

Permit Number - TC-RES-1025-05099
Review Name: RESIDENTIAL ADD/ALT v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/17/2026 Residential Zoning APPROVED
03/09/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/09/2026 Residential Building - Standard REQUIRES RESUBMIT TC-RES-1025-05099 4th
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide a separate Comment Response Letter when submitting updated plans. Facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

PROVIDE A COMPLETE PLAN SET showing all proposed alterations to the building with 2018 IRC code compliance. The plans require sufficient detail for demonstrating minimum building code compliance for passing all progress inspections.

Note the 2018 IRC reference on the plans.

Provide a response letter addressing each comment with location of change on the plans.

Provide a complete construction plan set file.

Provide a clear and concise construction plan set. Sample drawings are available for understanding details. Sample plans at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits

SECTIONS - DETAILS:

1. Provide a proposed wall section detail for the proposed exterior framed (insulated) wall enclosing the vehicle door opening, R403.1.6. Show exterior wood siding and covering if stucco. Both the sheathing and wall framing require a 6” clearance above the ground or 2” above a paved area, R703.7.2.1. A concrete stem wall base is typically required for achieving the required separation from the exterior surface.
2. Clarify the placement of ceiling/roof insulation with either a ventilated attic or sealed rafter cavity, R806. Identify the ventilation requirements and insulation types for complying with the condensation control issues.

PLUMBING PLANS:

1. Show the location of concrete cuts for placement of branch drainpipes P3005.4.1.

MECHANICAL PLANS:

1. Show a mini-split system or extended ducts for providing heating/cooling to the bedroom on the plans, M1401.3, M1601.1.
2. Show bathroom moisture control with either a window or exhaust fan with minimum 50 CFM rating and duct to the exterior, R303.3 and M1505.

ELECTRICAL PLANS:

1. Show receptacle outlets at wall spaces 2’ or more with no wall point (exclude door openings) more than 6’ from a receptacle outlet, E3901.2.
2. Show Bathroom receptacles with a separate 20 AMP dedicated circuit, E3703.4 and E3901.6.
3. Show arc-fault circuit interrupter for all bedroom circuits, E3902.16.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Show compliance with the energy code requirements for placement of wall (R-13 in 2x4 framing or R-19 in 2x6 framing) and ceiling insulation with R-38 at ceiling if there is attic space or (R-30 batt with R-5 or R-7 foam board at roof) if no attic space, N1102.1.

If you have any questions, please contact:
Kenneth.VanKarsen@tucsonaz.gov
City of Tucson Residential Plan Review
----------------------
02/06/2026 Addressing Validation REVIEW COMPLETED
02/06/2026 PDSD Application Completeness Express REVIEW COMPLETED