Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-1025-05029
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/04/2025 | Light Residential Building Review (OIP) - Standard | APPROVED | |||
| 11/04/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/27/2025 | Residential Zoning | REQUIRES RESUBMIT | FROM: Georgia Pennington, Lead Planner PDSD Zoning Review Section PROJECT: TC-RES-1025-05029 1511 E PLAZA DE LIRIOS Residential Addition/Alteration TRANSMITTAL DATE: 10/27/25 The site is in the R-1 zone (UDC 4.8-2). A “Single-Family Residence, Detached” is a permitted use in the RX-2 zone 1. [rovide a complete plot plan. Plot plan requirements can be found at this link here: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Plan-Examples/Plot-Plan-Example. 2.(COMMENT) Provide dimensions from the posts or walls of the RV structure to the property lines. 3. The maximum height limit is 12' for an accessory structure. At minimum, a Board of Adjustment variance will be required. For additional information on the Board of Adjustment process please contact Mark Castro at mark.castro@tucsonaz.gov. 4. (COMMENT) In an R-1 zone, the minimum setback to a all property lines is 20’. A Design Development Option (DDO) application will be required to be submitted and approved before final Site Zoning approval can be provided for this permit. For more information about the DDO process, including an application, see https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration#section-3 If you are interested in moving forward with the DDO to allow the reduced setback, upload the DDO application to the “Zoning Modifications/DDO” subrecord on this permit within TDC Online. For instructions on creating a subrecord, please see https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf Once approval of the DDO is provided in a DDO Decision Letter, upload that letter and resubmit this permit following the two-week post-decision appeal period. If the applicant chooses to pursue a B/A variance, the setback reductions can be included within the same case. If you have any questions about this transmittal, contact Georgia Pennington at Georgia.Pennington@tucsonaz.gov . |
||
| 10/15/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |